US Land Life

Perry County, AL

Wind & Solar Leasing in Perry County, Alabama: The EG Saturn Solar Project

Perry County isn't a hypothetical candidate for utility-scale solar -- it's the current site of one, under construction now. EG Saturn Solar I and II, a roughly 160 MW, $221 million project on more than 1,000 acres near Newbern, is a real, dated, dollar-specific example of what a large solar lease looks like here, and what it took to get approved.

This page covers what's specific to Perry County. For the general explanation, see the national guide.

The EG Saturn Solar project: real numbers, not a hypothetical

If you're wondering what a large-scale solar lease actually looks like on the ground in Perry County, there's a current, concrete answer rather than a theoretical one. EG Saturn Solar I and EG Saturn Solar II -- officially listed with the Alabama Public Service Commission under those names -- are two solar plants of just under 80 megawatts each, built on a combined site of more than 1,000 acres on Alabama Highway 61 near Newbern. About 98% of that acreage sits in Perry County, with the small remainder in neighboring Hale County. The project has actually been in the works for roughly a decade, with visible construction activity ramping up substantially in the months before this research pass. Miami-based Enfinity Global is the company building the site, with a spokesman confirming a targeted completion date of June 2027.

The financing behind the project is just as concretely documented: a syndicate of lenders led by JPMorgan Chase Bank has placed more than $221 million in construction financing on the EG Saturn project, according to the Perry County Herald's reporting on the recorded financing document itself. That's a meaningful, real benchmark -- a nine-figure institutional construction loan, arranged by a major national bank, for roughly 160 MW of generating capacity on land that a decade ago was likely valued and used as ordinary Black Belt row-crop or pasture acreage. For any Perry County landowner or prospective buyer trying to gauge whether utility-scale solar developers see the county's land and grid access as viable, this project is direct, current evidence that they do.

The county's approval process: a working precedent, not a zoning gap

Perry County's governing board approved the EG Saturn project, according to County Journal's reporting -- meaning that even without a general zoning ordinance (this project's own hub page for Perry County already establishes that no zoning-enabling local act was found for the county), there is a real, working county-level review and approval process for a large energy project of this scale. That's a genuinely useful, actionable fact for anyone weighing their own wind or solar lease offer on Perry County land: rather than assuming the absence of zoning means no county review applies at all, ask the Perry County Commission directly what process the EG Saturn project went through, since that's likely to be the closest available template for how the county would handle a similar proposal.

A decade-long development timeline is also worth internalizing if you're evaluating your own land's solar or wind potential: a solar lease offer from a developer is often the start of a multi-year process involving interconnection studies, financing, and permitting, not a fast transaction. If a developer approaches you about leasing Perry County acreage for solar or wind, ask specifically about their own project timeline and financing status, and treat the EG Saturn project's ten-year path from initial interest to under-construction as a realistic point of comparison rather than an outlier.

What to check before signing a wind or solar lease here

Beyond the county-level process, the standard national due-diligence questions for any solar or wind lease apply with particular weight in a Black Belt county like Perry: confirm the lease's duration and renewal terms, decommissioning and land-restoration obligations at the end of the lease, and how payments are structured (fixed rent per acre versus a share of energy revenue). Given this project's documented, multi-year timeline from initial interest to construction, also ask how long your own land would likely sit under an executed-but-not-yet-built lease, and what compensation, if any, applies during that period. And because Perry County's Black Belt soils and the region's well-documented heirs'-property patterns are both covered in detail on this county's hub page, confirm clean, marketable title before signing any long-term lease -- a fragmented or disputed title can complicate or delay a developer's ability to finance and build a project even after a lease is signed.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. $221M solar farm being built on 1,000 acres in Perry, Hale counties — Black Belt News Network (accessed 2026-09)
  2. $221 million solar financing recorded for land in Perry County — The Perry County Herald (accessed 2026-09)
  3. Perry County board approves a massive solar energy project — County Journal (accessed 2026-09)
  4. Watch: Solar farm being built in Perry County — Solar Now / Black Belt News Network (accessed 2026-09)

Last reviewed 2026-09