Logan County isn't a speculative wind-and-solar prospect -- it's already home to some of Colorado's largest operating wind facilities, built in phases since 2001. The county adopted its own dedicated Wind Energy and Solar Energy siting regulations in 2023, separate from general zoning, and those are the rules that actually govern a new lease or nearby development today.
This page covers what's specific to Logan County. For the general explanation, see the national guide.
Real, operating wind capacity -- not a future prospect
Logan County's wind buildout is long-established and large. The Peetz Table Wind Complex, west of the town of Peetz, was developed in two phases: an initial 29.7 MW project completed in 2001 that was, at the time, the largest wind farm in Colorado, followed by a 400.5 MW second phase completed in 2007 that added the Logan Wind Energy Center (201 MW) and the Peetz Table Wind Energy Center (199.5 MW). The complex -- roughly 430 MW combined -- is now owned by NextEra Energy Resources and ArcLight Capital Partners, with the second phase originally developed by Invenergy Renewables and NextEra together. Separately, the Colorado Highlands Wind Project northeast of Fleming adds about 90 MW across 60 turbines, with a studied expansion of roughly 20 MW more, and the Haxtun Wind Energy Project spans the Logan-Phillips county line with about 30 MW of additional capacity.
For a land buyer, this history matters in two ways. First, it means turbines, substations, and transmission corridors are already a physical presence across parts of the county, not a hypothetical -- worth checking sightlines, noise, and shadow-flicker exposure for any specific parcel near an existing facility. Second, some of the county's turbines are now roughly two decades old, and Colorado has been actively debating who bears responsibility and cost for eventual decommissioning of aging wind infrastructure -- a real, unresolved question for land near an older facility rather than a settled one.
The county's own siting rules, not a generic special-use process
Because Logan County adopted dedicated Wind Energy regulations (May 2023, amended August 2023) and Solar Energy regulations (August 2023) as their own chapters beyond the general Zoning Regulations, a new wind or solar lease here is not reviewed under the same generic special-use process as an ordinary agricultural building or subdivision. These purpose-built chapters are where setbacks from property lines and occupied structures, noise and shadow-flicker limits, decommissioning-bond requirements, and the hearing process for a new project actually live. Get the current text directly from the Planning, Zoning & Building Department before assuming a setback or bonding figure from another county's ordinance applies here -- renewable-siting codes vary significantly county to county even within Colorado.
If you're a landowner being approached for a lease rather than a buyer of already-leased land, ask whether the offered terms were negotiated against the current 2023 siting rules or an older draft, since the regulations were amended within months of adoption. If you're buying land near an existing turbine string or substation, ask the department whether the facility was permitted under the pre-2023 general zoning code or the newer dedicated chapters, since compliance obligations and any legal nonconforming status can differ.
What to verify before treating a lease as bankable
- Whether a specific parcel is already under an executed lease or option, or simply sits in a developer's broader area of interest -- an option-stage agreement pays far less than an operating lease.
- Whether the lease payment structure is a flat per-acre rate, a per-turbine/per-megawatt royalty, or some combination, and whether it steps up once the project reaches commercial operation.
- The decommissioning-bond amount required under the county's 2023 Wind Energy or Solar Energy regulations, and who -- developer or landowner -- is contractually on the hook if the bond falls short.
- Whether the parcel or nearby land falls within the noise, shadow-flicker, or setback buffers the county's siting chapters define, since that can constrain what you can later build on an adjacent tract.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Peetz Table Wind Energy Center — Wikipedia (accessed 2026-09)
- Peetz Table (NextEra) wind farm — Global Energy Monitor (accessed 2026-09)
- EA-1611: Colorado Highlands Wind Project, Logan County, Colorado — U.S. Department of Energy (accessed 2026-09)
- EA-1812: Haxtun Wind Energy Project, Logan and Phillips County, Colorado — U.S. Department of Energy (accessed 2026-09)
- The wind turbines on his Colorado farm are 20 years old. Who's going to take them down? — The Colorado Sun (accessed 2026-09)
- Links & Documents (Zoning Regulations, Solar/Wind Energy Regulations) — Logan County, Colorado Government (accessed 2026-09)
Last reviewed 2026-09