Sedgwick County, CO
Wind and Solar Leasing in Sedgwick County, Colorado
Sedgwick County's flat, windswept high plains along the Nebraska border have already drawn a large-scale wind development -- not a speculative proposal, but a specific, named project with signed leases across more than 100,000 acres and a real permitting timeline. If you own or are buying land in the county's South Table area, understanding this project (and the county's separate solar permitting track) is directly relevant to any lease offer you might receive.
This page covers what's specific to Sedgwick County. For the general explanation, see the national guide.
A real, large-scale wind project already under lease: Overland Pass Energy
Overland Pass Energy, LLC -- a wholly owned subsidiary of National Renewable Solutions, LLC -- has petitioned Sedgwick County for a special use permit to build a multi-phase, utility-scale wind energy system of up to approximately 310 turbines. The project footprint is substantial: roughly 113,145 acres are already under land leases and easements with Overland Pass Energy, covering the South Table area of the county's high plains, bounded by I-76 to the north, the Logan County line to the west, the Phillips County line to the south, and the Nebraska state line to the east. A Planning and Zoning hearing on the National Renewable Solutions special use permit application was held in September 2024, with the special-use-permit hearing itself scheduled for October 2024.
As proposed, the project's first phase involves 103 turbines with a 400-megawatt commercial offtake, targeting construction starting in the second quarter of 2026 and an initial commercial operation date of September 15, 2027, with subsequent phases potentially completing by the fourth quarter of 2028. This review could not confirm the permit's final approval or denial status, or current landowner lease-payment terms, from public sources after the fall 2024 hearing -- confirm the project's current status, and whether it affects a specific parcel, directly with Sedgwick County Planning and Zoning before relying on this page as a current status report.
What this means if you're evaluating a lease offer or nearby land
If you own land within the described South Table boundary, or are considering buying land there, a wind-lease or easement offer referencing this project (or a similar one) is a realistic possibility rather than a speculative pitch -- the scale of acreage already under lease (over 113,000 acres) indicates the developer has been actively signing agreements with landowners across a wide area. Before signing any lease or easement related to this or another wind project, have an attorney experienced in energy leases review the term length, payment structure (per-turbine, per-acre, or production-based royalty), decommissioning-bond requirements, and any restrictions the lease places on your own future use of the land -- these terms vary significantly between developers and specific lease agreements and are not standardized across Colorado.
If you're buying land in this part of the county without an existing lease already attached, ask the seller directly and check county land-use records for whether the parcel is already encumbered by a lease or easement connected to this project -- an existing wind lease or easement can affect a parcel's usable footprint, future development options, and resale value regardless of whether turbines are ultimately built on that specific parcel.
A separate track: the county's solar energy conversion system rules
Beyond the Overland Pass wind project, Sedgwick County has separately been developing its own regulations specifically for solar energy conversion systems, with a public input report on proposed solar rules dated February 2024. This indicates the county has been actively working through its own permitting framework for solar development independent of the wind project described above -- if a solar lease or development proposal is what you're evaluating rather than wind, confirm the county's current solar-specific permitting requirements and any acreage or setback standards directly with Sedgwick County Planning and Zoning, since this review could not verify the solar rules' final adopted form from public sources.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- CPW 7/24 response to NRS-Overland Pass East Wind Project — Sedgwick County, Colorado Government (accessed 2026-09)
- Overland Pass Energy, LLC -- Agency Response Letter — Sedgwick County, Colorado Government (accessed 2026-09)
- OPE Project Staff Report — Sedgwick County, Colorado Government (accessed 2026-09)
- 2024-09-12 NRS Application Hearing Agenda — Sedgwick County, Colorado Government (accessed 2026-09)
- Solar Energy Conversion Systems -- Public Input Report — Sedgwick County, Colorado Government (accessed 2026-09)
- 2023-07-18 Sedgwick County NRS wind application packet — Sedgwick County, Colorado Government (accessed 2026-09)
- A land rush for renewable energy is transforming the Eastern Plains — The Colorado Sun (accessed 2026-09)