If a wind or solar developer has approached you about leasing Bannock County land, or you're weighing whether nearby renewable development could affect a parcel, know this up front: the county banned large-scale wind and solar outright in 2024, and a 2025-2026 ordinance rewrite that would let both back in through a conditional use permit was still working through drafting and public hearings as of the most recent reporting -- nothing here is settled yet.

This page covers what's specific to Bannock County. For the general explanation, see the national guide.

The 2024 ban: a real prohibition, not a moratorium

In March 2024, following the expiration of a temporary moratorium the county had put in place while it studied the issue, the Bannock County Board of Commissioners voted 2-1 to enact an outright ban on large-scale solar and wind energy projects countywide. That's a meaningfully stronger step than a pause for further study -- it means that, as of this writing, a commercial-scale wind or solar project simply cannot be permitted anywhere in unincorporated Bannock County under current ordinance, regardless of zoning district or site suitability. If a developer has approached you about a lease on the premise that a project is imminent, the current legal baseline in Bannock County says otherwise.

The proposed reversal: conditional use permits in four zone types, with a heavy application burden

Since 2025, Bannock County has been rewriting its land use rules into a single, consolidated Land Use and Development Ordinance (LUDO) intended to combine eight of the county's existing, separately adopted land-use ordinances into one code. Energy policy is one of the most contested pieces of that rewrite: as reported in August 2026, the draft LUDO would allow wind, solar, AND nuclear energy projects back in as conditional uses -- reversing the 2024 ban -- specifically in Agricultural, Commercial General, Industrial, and Light Industrial zoning districts. "We can't be a 'no' county," one county official was quoted saying about the rationale for reconsidering the outright ban.

That reversal comes with real teeth, not a rubber stamp: the draft process would require a public hearing plus a substantial packet of studies and plans from any CUP applicant, including an emergency plan, an erosion and sediment control plan, a fire protection plan, a visual impact analysis, specific setback requirements (not fully detailed in public reporting located during this research pass), a decommissioning and termination plan, wildlife studies, a transportation plan, a weed control plan, and a fish, wildlife, and native plant protection plan. For a landowner weighing a lease offer, that list is a useful gut check on how developed a specific developer's proposal actually is -- a company that hasn't yet worked through decommissioning and wildlife-impact plans is not close to a permit under this draft, regardless of what a lease offer's language implies about timeline.

Organized advocacy on both sides -- and no adoption date set as of the most recent reporting

This isn't a quiet administrative rewrite -- it's a live local political fight with organized groups on both sides. The Southeast Idaho Energy and Property Alliance (SEIEPA) and the Portneuf Resource Council have been working to pass the energy-related portions of the new LUDO, with SEIEPA reporting roughly 250 local residents who had signed in support as of August 2026 reporting. A separate advocacy group, Idaho Energy Freedom, has publicly opposed the county's restrictive stance on solar and wind. Meanwhile, opponents of loosening the ban have also organized, with local reporting in August 2026 describing residents on both sides turning out at public sessions over the rewrite.

As of the most recent reporting located during this research pass (mid-to-late August 2026), the county was still making technical corrections to the draft LUDO document, with public hearing notices and a finalized draft still to come -- no adoption date had been set. That means the entire framework described above -- the CUP pathway, the four eligible zone types, and the application requirements -- is a proposal, not current law, and could still change in response to public hearings before any final vote. If a wind or solar lease offer or a neighboring project's status matters to your purchase decision, confirm the LUDO's actual, current adoption status directly with Bannock County Planning & Development rather than relying on either the 2024 ban or this draft reversal as fixed fact.

If you're the landowner being approached about a lease

Given that no CUP pathway for large-scale wind or solar currently exists in Bannock County, any lease offer you receive today is necessarily contingent on the LUDO rewrite passing in a form that allows the specific project type on your parcel's zoning district -- treat any timeline promises in a lease offer with real skepticism until you've confirmed the ordinance's status yourself. If and when a CUP pathway is adopted, ask specifically about your parcel's zoning district (only Agricultural, Commercial General, Industrial, and Light Industrial districts are covered under the current draft), and have an attorney experienced in energy leases review payment structure, term length, and decommissioning obligations before signing anything -- the ordinance's own decommissioning-plan requirement doesn't substitute for equivalent protections in your own lease contract.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Bannock County Commission approves total ban on large solar, wind projects but leaves door open for dialogue — Idaho State Journal (accessed 2026-09)
  2. Bannock County eyeing reversal of alternative energy ban — Idaho State Journal (accessed 2026-09)
  3. "We can't be a 'no' county," New Land Use and Development Ordinance Rewrite could overturn ban on Solar Farms in Bannock County — KIFI Local News 8 (accessed 2026-09)
  4. "Look elsewhere": Solar farm ordinance rewrite draws ire of Bannock County residents for and against the ban — KIFI Local News 8 (accessed 2026-09)
  5. Idaho Energy Freedom Releases Statement Opposing Proposed Bannock County Ban on Solar Energy and Wind Projects — Idaho Energy Freedom (accessed 2026-09)
  6. Land, Energy, and Choice: What's at Stake in Bannock County's Ordinance Update — Idaho Conservation League (accessed 2026-09)
  7. Bannock County Shares Timeline for Land Use & Development Ordinance Rewrite Project — Pocatello-Chubbuck Observer (accessed 2026-09)
  8. Our Future -- LUDO Rewrite Project — Bannock County, Idaho Government (accessed 2026-09)
  9. Solar Ordinance — Bannock County, Idaho Government (accessed 2026-09)

Last reviewed 2026-09