Bureau County is one of Illinois's more established wind-energy counties, with three utility-scale wind farms already turning and a fourth larger project working through permitting. If you've been offered a lease, are buying land already under one, or are just buying nearby, here's what's actually on the ground and what governs it.

This page covers what's specific to Bureau County. For the general explanation, see the national guide.

What's already built

Bureau County hosts three operating utility-scale wind farms. Big Sky Wind (239 MW, owned by RWE Renewables Americas) has been generating since February 2011. Walnut Ridge Wind Farm (212 MW, owned by BHE Renewables) and Providence Heights Wind (72 MW across 36 turbines, owned by Avangrid Renewables, operating since mid-2008) round out the county's existing wind fleet -- together, roughly 523 megawatts of installed capacity. That's a substantial, multi-decade-old footprint: a meaningful share of the county's agricultural land already sits under a recorded wind lease or easement covering turbine pads, access roads, and underground collector lines, even in areas where the surface use still looks like ordinary farmland.

If you're buying land in Bureau County -- whether or not the listing mentions it -- pull the parcel's recorded documents at the Bureau County Recorder's Office and ask specifically whether any wind lease, easement, or collector-line agreement is recorded against it, since these don't always show up in a standard title search summary and don't necessarily change how the surface looks or is farmed day to day.

What's proposed, and why it's stalled

A fourth, larger project has been proposed by Leeward Renewable Energy: up to 147 megawatts across as many as 52 turbines, with an estimated $35 million in landowner lease payments and $48.8 million in local tax revenue over the project's life. As of mid-2026, though, this project -- like roughly 250 similar wind projects nationally across some 30 states -- was delayed by a federal-level permitting action, according to Illinois public radio reporting (NPR Illinois, WGLT, and other stations) from June 2026. The American Clean Power Association's reporting on the broader national freeze cited tens of thousands of construction jobs and tens of billions in capital investment affected across all the delayed projects combined.

This means the Leeward project's ultimate fate -- whether it proceeds, on what timeline, and with what final scope -- was genuinely unresolved as of this writing. If you're evaluating land in the part of the county where this project has been proposed, treat any lease offer or nearby-project information as provisional until the federal permitting picture clears, and check directly with Bureau County Planning & Zoning for the current status of any pending application.

The state law limiting what Bureau County can require

Illinois counties don't have unlimited authority to write their own wind and solar rules. Public Act 102-1123, signed by Governor Pritzker on January 27, 2023, amended 55 ILCS 5/5-12020 of the Counties Code to establish statewide siting standards for commercial wind and solar facilities -- defined as wind systems of at least 500 kW nameplate capacity and ground-mounted solar systems built to sell power wholesale or retail. The law sets a maximum wind-turbine setback of 2.1 times the total blade-tip height, measured from the turbine base to the nearest wall of a non-participating residence (a county may set a smaller setback, but not a larger one), and separately standardizes requirements around decommissioning, blade-tip height, drainage plans, and treatment of agricultural land. Counties are barred from imposing outright moratoriums on wind or solar development, and must hold a public hearing within 45 days of an application being submitted.

In practice, this means Bureau County's own wind/solar zoning ordinance operates as a local implementation of a state-set ceiling rather than an independent local policy choice -- the county can be less restrictive than the state maximums, but not more. We were not able to independently confirm the exact setback distance, decommissioning-bond formula, or other specific numbers Bureau County's own ordinance actually uses (as opposed to the statewide maximum) during this research pass, since direct access to the county's zoning site was blocked; confirm current, specific ordinance language directly with Bureau County Planning & Zoning before relying on any particular figure.

If you've been offered a lease, or are buying land already under one

If you're the landowner being approached about a new lease: understand that Bureau County's ordinance (bounded by the PA 102-1123 statewide ceiling) sets the regulatory floor on setbacks and decommissioning, not the lease's financial terms. Payment structure and escalation, term length and renewal options, easement scope (turbine pads only, or also access roads, collector-line corridors, and setback buffers on surrounding acreage you'd otherwise farm normally), and who bears decommissioning cost if the developer becomes insolvent are all matters of private contract -- review by an attorney experienced in Illinois wind/solar leases is worth the cost before signing, especially given how long these leases typically run (often 20-30+ years with renewal options).

If you're buying land already subject to a recorded wind lease or easement -- whether tied to Big Sky, Walnut Ridge, Providence Heights, or a future Leeward project -- pull the actual recorded document from the Bureau County Recorder rather than relying on a listing summary. Confirm what portion of the parcel is actually restricted, whether the lease/easement transfers automatically to you as the new owner (most wind leases are structured to run with the land), what ongoing payments (if any) you'd be entitled to, and whether financial security for eventual decommissioning is actually in place for that specific turbine or project -- Bureau County Planning & Zoning can confirm whether a decommissioning bond or escrow is on file for a given project.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Big Sky Wind LLC -- Bureau, Illinois — CleanView (accessed 2026-09)
  2. Walnut Ridge Wind Farm -- Bureau, Illinois — CleanView (accessed 2026-09)
  3. Big Sky wind farm — Global Energy Monitor (accessed 2026-09)
  4. PROVIDENCE HEIGHTS Wind Power Project Fact Sheet — Avangrid Renewables (accessed 2026-09)
  5. Trump administration delays Illinois wind farm development — NPR Illinois (accessed 2026-09)
  6. Trump administration blocks wind farm development in Illinois and across the nation — WGLT (accessed 2026-09)
  7. Trump administration blocks wind farm development in Illinois and across the nation — St. Louis Public Radio (accessed 2026-09)
  8. Public Act 102-1123 — Illinois Compiled Statutes (Illinois General Assembly) (accessed 2026-09)
  9. Illinois Enacts New Law to Standardize Local Permitting for Renewable Energy Facilities — ArentFox Schiff (accessed 2026-09)
  10. County wind and solar zoning restrictions (PA 102-1123) issue brief — Illinois State Association of Counties (accessed 2026-09)
  11. Bureau County Planning & Zoning Department — Bureau County, Illinois Government (accessed 2026-09)

Last reviewed 2026-09