Carroll County, IN
Wind and Solar Leasing in Carroll County, Indiana
If you own land in Carroll County and a developer has approached you about a wind or solar lease, the county's current answer is effectively not yet: a multi-year moratorium, extended again as recently as mid-2024, has kept commercial wind and solar development on hold while a permanent ordinance is worked out.
This page covers what's specific to Carroll County. For the general explanation, see the national guide.
The moratorium's mechanics: two ordinances, renewed on a schedule
Carroll County hasn't banned wind and solar outright through a single permanent vote -- it has instead extended a temporary moratorium repeatedly while county officials work toward a lasting ordinance. The most recent extension came via two separate ordinances passed July 1, 2024: Ordinance 2024-9, restricting installation of commercial wind power devices, and Ordinance 2024-10, doing the same for commercial solar. Each extension bought roughly six more months, with commissioners explicitly framing the shorter window as a way to add urgency for the attorneys drafting a permanent version, rather than letting the issue drift for a full year at a time. If you're evaluating a lease offer, ask specifically when the current moratorium period ends and whether a permanent ordinance has since been adopted -- the answer may well have changed since this page's last review.
Separately, and more fundamentally, Purdue Extension's own analysis of Carroll County's development standards found that commercial Wind Energy Conversion Systems (WECS) are not currently permitted in any zoning district in the county -- meaning even after a moratorium period lapses, a wind project would still need the county to actually authorize wind use somewhere on its zoning map before a specific application could be approved. The county does have detailed setback and buffer standards already drafted for wind, suggesting officials have done real technical work even while withholding approval in practice.
A genuinely contentious local politics, not a quiet administrative delay
This moratorium hasn't been a low-visibility bureaucratic holding pattern. Commissioner meetings on wind and solar have drawn large crowds, with residents overwhelmingly opposed to any wind or solar development voicing concerns about farmland impacts and calling solar panels "eye sores" in public comment. County leadership, including the board chairman, has framed the county's posture as actively resisting outside pressure -- including from the state -- to loosen local control over renewable-energy siting. For a landowner deciding whether to sign a lease option (which often locks in terms years before construction), that political durability matters: this isn't a moratorium that looks likely to lapse quietly the next time it comes up for renewal.
What this means if you already have, or are considering, a lease offer
A lease option payment from a wind or solar developer in Carroll County typically compensates you for giving the developer exclusive rights to pursue permitting on your land during the option period -- it doesn't guarantee the project will ever be built, and in Carroll County specifically, it doesn't guarantee the county will even allow it during that window. Before signing, ask your own attorney to confirm (1) what happens to the option payment and the lease term if the county's moratorium is still in place when the option period runs out, (2) whether the agreement's timeline assumes a level of local approval that may not currently exist under Carroll County's ordinance, and (3) whether the developer has a specific plan for engaging with the county's ongoing ordinance-drafting process rather than simply waiting it out.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Purdue Extension studies Indiana commercial solar and wind county ordinances — Carroll County Comet (accessed 2026-09)
- Moratorium on wind & solar extended — Carroll County Comet (accessed 2026-09)
- Residents seek longer moratorium on wind/solar — Carroll County Comet (accessed 2026-09)
- Carroll County residents seek longer wind/solar moratorium which ends July 6, 2024 — Indiana Economic Digest (accessed 2026-09)
- Carroll County Commissioners adopt solar ordinance which could prevent any being erected locally — Indiana Economic Digest (accessed 2026-09)
- Carroll County Opposes Possible Wind and Solar Farm — WLFI (accessed 2026-09)
- County resistance plagues Indiana renewable progress — Indiana Capital Chronicle (accessed 2026-09)
Last reviewed 2026-09