Humboldt County has spent more than two years working through this question: a proposed 175 MW RWE wind project is the immediate reason, a targeted 2024 moratorium bought the county time to write rules, and a new, contested Commercial Wind Energy Ordinance (No. 77) took effect after a unanimous Board of Supervisors vote in July 2026. Here's what's confirmed, what's still unresolved, and what a landowner or buyer should check directly before treating a lease offer as settled.
This page covers what's specific to Humboldt County. For the general explanation, see the national guide.
The project: RWE's proposed 175 MW Humboldt Wind
RWE's Humboldt Wind project is proposed for the southeast quadrant of Humboldt County on privately owned, leased farmland, with a stated capacity of 175 megawatts and operations targeted to begin in 2027 -- enough generating capacity, per RWE's own project materials, to power more than 40,000 homes. RWE frames the project as privately financed, with decommissioning costs built into the project's financial planning from the outset, and describes turbine footprints as small enough that participating landowners can continue farming the surrounding acreage. We could not independently confirm a specific turbine count for this project in this research pass -- treat any turbine-count figure you encounter elsewhere as unconfirmed until RWE or the county publishes a specific site plan.
County supervisors have been briefed directly by RWE representatives, who described the company's preference for working directly with the county rather than through statewide lobbying, discussed road-use, drainage-tile, and repowering protections, and proposed an early public open house with third-party subject-matter experts so residents could ask questions in a low-pressure setting. Supervisors, for their part, emphasized zoning, setbacks, and the fact that the county's moratorium on new energy-siting applications remained in effect throughout these discussions -- meaning RWE's project could be briefed and discussed with the county well before any application could actually be filed and approved.
The moratorium: narrow in scope, extended past its original sunset
Resolution 2024-01-07 took effect January 2, 2024, and imposed a one-year freeze on new commercial energy-siting applications in Humboldt County. Its language was specific: the county was prohibited from "receiving, reviewing, considering, or approving" any application for a Commercial Wind Energy Conversion System, a Private Commercial Pipeline Transmission System, a Commercial Solar Energy System, or a Commercial Electrical Energy Transmission System. It was not a general moratorium on all zoning permits, rezonings, or subdivision approvals -- a distinction worth knowing if you were told simply that Humboldt County "has a moratorium" without more detail.
The resolution's original sunset was one year from ratification, or adoption of a new Comprehensive Plan and Zoning Ordinance, whichever came first -- but that timeline slipped. The county's plan and ordinance rewrite took longer than a year, so supervisors removed the fixed sunset date and kept the freeze on new energy-siting applications in place until the Comprehensive Plan chapters and updated ordinances were finished. The county's draft 2026 Comprehensive Plan had a first reading on March 30, 2026, and the wind-specific piece of the puzzle -- Ordinance No. 77 -- was adopted July 13, 2026 (see below). We could not confirm from this research pass whether the moratorium's solar and pipeline/transmission provisions were also formally lifted alongside the wind ordinance's adoption, or whether they remain in force pending additional ordinance chapters; if you're evaluating a solar lease or pipeline easement rather than a wind lease specifically, confirm current moratorium status for that use directly with the Zoning Administrator.
The new ordinance: adopted July 2026, and already contested by the developer
Ordinance No. 77, the Commercial Wind Energy Ordinance, was drafted by the county Planning and Zoning Commission and went through three readings before the Board of Supervisors, with the second reading approved in June 2026 and the third and final reading -- following a lengthy public hearing -- approved unanimously on July 13, 2026. Reported provisions include a maximum turbine height of 675 feet; setback distances of two miles from rivers and parks and 2,000 feet from a neighboring property line (a setback that a neighboring landowner can waive by agreement); noise and shadow-flicker standards; drainage and farm-tile protections; and references to FAA airspace-approval requirements and to parks, public areas, and cemeteries identified in the county's 2026 Comprehensive Plan. Supervisors approved minor language amendments on some of these cross-references shortly before the final vote, but determined the changes were not substantial enough to require restarting the three-reading process.
The ordinance's practical effect on the RWE project is genuinely contested. RWE's attorney, Kristy Rogers, told supervisors during the public hearing that the ordinance's setback requirements function as a de facto prohibition on commercial wind development in the county, and that RWE was weighing pursuing project approval through the Iowa Utilities Commission -- a state-level process -- rather than through the county, while remaining open to further discussion with supervisors. Other participants in the same hearing pushed back on that framing: county resident Dyle Erickson praised the Planning and Zoning Commission's work and argued the ordinance prioritizes public safety, and union representatives also testified, alongside more than 40 minutes of public comment overall. If you are evaluating a lease offer or land purchase tied to this project, that dispute -- whether Ordinance 77 makes the RWE project practically unbuildable at the county level, or whether it's a workable framework RWE will build within -- is unresolved as of this review, not a settled fact either way.
What to verify before treating a lease offer or nearby project as a value driver
- Whether a specific parcel falls within RWE's Humboldt Wind project footprint (southeast quadrant of the county) or is simply nearby, since only parcels actually within a leased or optioned project area see direct lease income.
- Whether Ordinance No. 77's current setback and siting requirements (675-foot height limit; two-mile setback from rivers/parks; 2,000-foot setback from neighboring property lines, waivable by agreement) apply as written to a specific proposed turbine location, and whether RWE has indicated it will pursue the county process or the Iowa Utilities Commission route instead.
- Current moratorium status specifically for solar or pipeline/transmission siting (as distinct from wind), since this page could not confirm whether those provisions of Resolution 2024-01-07 were lifted alongside Ordinance 77's adoption.
- For a parcel already under an executed wind lease, the payment structure (signing bonus versus per-turbine or per-acre royalty), whether payments depend on the project reaching operational status, and whether the lease or an associated easement is recorded against the property (a recorded lease can bind a subsequent buyer).
- Any county road-use, right-of-way, or drainage-tile protection requirements that would apply to construction traffic or turbine placement near an adjacent parcel, even one not directly leased.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Humboldt Wind Farm — RWE Americas (accessed 2026-09)
- RWE representatives brief Humboldt County supervisors on proposed wind project, discuss zoning, road and decommissioning protections — CitizenPortal.ai (accessed 2026-09)
- Moritorium for commercial wind systems in effect — The Humboldt Independent (accessed 2026-09)
- Humboldt County Board of Supervisors approve the second reading of wind energy ordinance — 97.7 The Bolt (accessed 2026-09)
- Humboldt County Supervisors approve third reading of Commercial Wind Energy Ordinance following lengthy public hearing — 97.7 The Bolt (accessed 2026-09)
- Humboldt County regulates turbines — Messenger News (Fort Dodge) (accessed 2026-09)
- 2026 Humboldt County Comprehensive Plan - DRAFT (March 30, 2026) — Humboldt County, Iowa Government (accessed 2026-09)
- Zoning — Humboldt County, Iowa Government (accessed 2026-09)
- Ordinances — Humboldt County, Iowa Government (accessed 2026-09)
- Humboldt County, IA (Wind) — Center for Local Policy (accessed 2026-09)
Last reviewed 2026-09