Wind and Solar Leasing in Ida County, Iowa
If you're evaluating Ida County land partly for wind-lease income, or buying near an existing turbine, understand that this county is not weighing whether to allow wind development -- it already has one of Iowa's largest turbine fleets, and MidAmerican was still proposing to add to it as of 2025.
This page covers what's specific to Ida County. For the general explanation, see the national guide.
A mature wind-energy county, not a new one: the Ida Grove Wind Farm and what followed
MidAmerican Energy built the Ida Grove Wind Farm in Ida County as part of its 2016 "Wind X" initiative -- roughly 134 turbines with up to 301 megawatts of generating capacity, constructed alongside a companion Wind X project of about 104 turbines (250 MW) across the state line in O'Brien County. Combined, MidAmerican described the two-county Wind X build-out as delivering more than $115 million in landowner payments per year and more than $160 million in property tax revenue over 30 years -- figures that describe the two-county project together, not Ida County's share alone, so treat them as a scale indicator rather than a per-parcel or single-county estimate.
MidAmerican has continued adding to the county's turbine fleet since 2016. As of May 2025, local television news reporting described the company proposing to add another 8 to 16 turbines to a fleet already exceeding 200 turbines standing in Ida County, with MidAmerican holding a public meeting in the county to discuss the expansion. If you're a landowner being approached about a new lease, or a buyer evaluating a parcel someone else has leased, ask specifically which phase of development is involved -- the original Wind X-era turbines (built and generating since 2016) versus a newer expansion phase -- since lease terms, payment timing, and construction-period disruption can differ between an established turbine and a newly sited one.
The county's own wind ordinances: Section 31 and the assessment framework
Unlike some Iowa counties that regulate wind development only through general zoning language or not at all, Ida County has adopted wind-specific ordinance provisions: Ordinance 19 (Wind Energy Assessment) and Ordinance 27, which amended Section 31 (Wind Energy) of the county's zoning ordinance. That means turbine siting, and the property-tax assessment treatment of wind-energy conversion property, are addressed in the county's own ordinance text rather than left to ad hoc case-by-case decisions. We could not obtain the full ordinance text directly in this research pass (see the methodology note), so the specific setback distances, noise limits, and decommissioning requirements in the current version of Section 31 should be confirmed directly with the county rather than assumed from this summary.
For a specific parcel, the terms that actually control turbine placement, access-road routing, and any noise or shadow-flicker limits near that parcel come from two sources working together: the county's Section 31 ordinance provisions (the public regulatory floor) and the recorded easement or lease agreement the wind developer negotiated with the specific landowner (the private contractual terms, which are often more restrictive or more detailed than the ordinance's minimums). Pull both -- the current ordinance text from the county, and the recorded easement from the County Recorder -- for any parcel where wind development is a live consideration.
What to check before relying on wind-lease income or buying near a turbine
- Pull the recorded easement or lease document for the specific parcel from the Ida County Recorder (712-364-2220) -- this sets the actual payment structure, term length, access-road, and decommissioning terms that apply to that parcel.
- Ask the Ida County Assessor (712-364-3622) how an existing turbine easement affects the parcel's assessed value and property tax bill; Ordinance 19 specifically addresses wind-energy-conversion-property assessment.
- Confirm with the county which specific project phase (2016-era Wind X buildout vs. the 2025-era expansion proposal) is closest to or affects the parcel, since construction timing and disruption differ between an operating turbine and one still in the proposal stage.
- Get the current, full text of Ordinance 27/Section 31 directly from the county rather than relying on a secondhand summary, and confirm any setback, noise, or decommissioning requirement against the specific turbine or proposed turbine nearest the parcel.
- If you're the one being offered a new lease, have an attorney experienced in Iowa wind-easement law review the payment structure, term length, and decommissioning/restoration obligations before signing.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Ordinance 19 Wind Energy Assessment — Ida County, Iowa Government (accessed 2026-09)
- Ordinance #27 Amended Section 31 Wind Energy — Ida County, Iowa Government (accessed 2026-09)
- MidAmerican chooses O'Brien, Ida Grove counties for wind projects — Business Record (accessed 2026-09)
- MidAmerican Energy wants to build more wind turbines in Ida County — KTIV (accessed 2026-09)
- MidAmerican to build new wind farms in Northwest Iowa counties — Sioux City Journal (accessed 2026-09)
- Ida County Recorder — Ida County, Iowa Government (accessed 2026-09)
- Ida County Assessor — Ida County, Iowa Government (accessed 2026-09)
Last reviewed 2026-09