Page County, IA
Wind and Solar Leasing in Page County, Iowa
Page County's commercial wind story is not a quiet, settled matter -- the Shenandoah Hills Wind Energy Center south of Shenandoah went through a voided permit, a federal appeal, and a change of ownership before construction resumed in earnest. If you're evaluating land near the project or considering any wind lease in the county, this history shapes what you should verify.
This page covers what's specific to Page County. For the general explanation, see the national guide.
The project and its rocky path to construction
The Shenandoah Hills Wind Energy Center is a 200 MW commercial wind project straddling the Page-Fremont county line south of Shenandoah, with 54 turbines total spread across both counties on roughly 45,000 acres involving some 270 participating landowners. Chicago-based Invenergy proposed the project and, after nearly six months of public debate, won a contentious 2-1 Page County Board of Supervisors vote approving the permit application in 2022 (Fremont County approved its portion separately, also in 2022). Opposition organized locally, including a Facebook group, Page County Horizons, that encouraged attendance at public meetings and circulated material critical of wind energy.
The approval did not end the dispute. In 2023, Page County's zoning administrator ruled the permit application void after Invenergy removed six turbines from the project -- a change the county deemed a 'material change' requiring a fresh review rather than a minor adjustment to an already-approved plan. Residents had already filed a lawsuit in October 2022 alleging violations of the Iowa Open Meetings Act, enterprise corruption, and approval of an application containing known falsehoods and inaccuracies. The permit-voiding and related litigation eventually reached the Eighth Circuit Court of Appeals, which addressed a mootness question arising from the permit's revocation, before the county and Invenergy reached a settlement authorizing construction of 23 turbines under the county's 2019 Commercial Wind Energy Conversion System (C-WECS) ordinance, with the lawsuits against the county dismissed and turbine locations finalized.
The specific setback fights: a nature trail and a radio transmitter
Part of what made the original siting contentious was specific, technical setback questions under the 2019 ordinance rather than abstract opposition alone. One resident raised concerns that a proposed turbine near the Wabash Trace Nature Trail -- a recreational rail-trail south of Shenandoah -- fell within a required half-mile setback the ordinance set for 'all other parks or areas' not specifically designated as a state or federal park or one managed by Page County Conservation. A separate turbine was flagged as being within three kilometers of radio station KYFR's AM transmitter towers, another siting standard the ordinance addressed, and another was noted as roughly a quarter mile from the Wabash Trace Trail -- potentially within the 'public areas' setback. These weren't abstract concerns: they were specific, mapped conflicts between proposed turbine locations and the ordinance's own numeric setback standards, which is part of why the permit review became so contested.
2025: a new owner, and construction back on schedule
In February 2025, Invenergy sold the Shenandoah Hills project to MidAmerican Energy, Iowa's largest electric utility -- reporting characterized the move as Invenergy stepping away from a project that had become a community-relations challenge, leaving MidAmerican to inherit both the settlement terms and the task of rebuilding trust with landowners and both counties' officials. MidAmerican has since hosted events for landowners and community members and met directly with supervisors and engineers in both Page and Fremont counties. As of September 2025 reporting, the project was roughly halfway complete, with 22 of the 54 total turbines fully constructed and several more partially built; MidAmerican indicated it was still on target for the project to be commissioned by the end of 2025, though some remediation work on Page County roads used for construction access could continue into early 2026.
Separately from the specific Shenandoah Hills settlement, the Page County Board of Supervisors adopted an updated countywide commercial wind ordinance replacing the 2019 C-WECS rules that governed the original dispute. The updated ordinance includes a waivable one-mile setback from non-participating property lines (meaning a neighboring landowner can consent in writing to a shorter distance), a 40-decibel sound limit measured at a non-participant's property line, and a 10-foot minimum depth requirement for buried feeder lines. If you're evaluating a new wind lease or a parcel near a potential future turbine site anywhere in the county -- not just near Shenandoah Hills -- these newer, updated standards, not the 2019 rules that governed the original dispute, are the current framework to confirm.
What to verify before relying on lease income or buying near a turbine site
- Confirm with the Page County Zoning Department whether a specific parcel sits inside the Shenandoah Hills Wind Energy Center's finalized 23-turbine footprint (post-settlement), and whether any turbine, access-road, or transmission easement crosses it.
- If evaluating a parcel near the Wabash Trace Nature Trail, a radio-transmitter site, or another mapped 'public area,' confirm the applicable setback under the current ordinance -- these specific conflicts were central to the original dispute.
- Pull any recorded wind easement or lease document for a specific parcel from the Page County Recorder, and confirm directly with MidAmerican Energy (the current project owner, as of February 2025) whether any document still naming Invenergy has been formally assigned.
- If considering a new lease outside the Shenandoah Hills footprint, confirm the current updated C-WECS ordinance terms (one-mile waivable non-participant setback, 40 dB sound limit, 10-foot feeder-line depth) directly with the Zoning Department, since these replaced the 2019 rules that governed the original, litigated project.
- Have an attorney experienced in Iowa wind-easement and land-use litigation review any lease or waiver before signing, given this county's documented history of permit disputes reaching federal appellate review.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Invenergy highlights details of proposed wind project for Page County Board of Supervisors — Valley News Today (accessed 2026-09)
- Debate over wind turbines, Invenergy’s ‘Shenandoah Hills’ wind farm continues in Page County — Wind Energy News (Wind-Watch) (accessed 2026-09)
- Page County board delays vote on proposed ‘Shenandoah Hills’ wind farm — Wind Energy News (Wind-Watch) (accessed 2026-09)
- Page County residents file lawsuit to block Shenandoah Hills Wind Project — Council Bluffs Nonpareil (accessed 2026-09)
- Wind project developer takes Page County to court over voiding "Shenandoah Hills" permit application — KMA Land (accessed 2026-09)
- Lawyers representing Page County citizens comment on court petition filed Monday — Wind Energy News (Wind-Watch) (accessed 2026-09)
- New Precedent on Mootness and Supplemental Jurisdiction in Wind Energy Permit Cases: Shenandoah Hills Wind Project Decision — CaseMine (accessed 2026-09)
- Revocation of Iowa Wind Turbine Permit Moots Appeal, Court Says — Bloomberg Law (accessed 2026-09)
- Invenergy to transfer ownership of Shenandoah Hills wind project to MidAmerican Energy — KMA Land (accessed 2026-09)
- MidAmerican Energy updates Shenandoah Hills Wind Project construction — KMA Land (accessed 2026-09)
- Page County board backs updated wind ordinance — KMA Land (accessed 2026-09)
- Concerns over ‘Shenandoah Hills’ wind farm project persist — Valley News Today (accessed 2026-09)
Last reviewed 2026-09