Saline County, KS
Wind and Solar Land Leasing in Saline County, Kansas
Saline County has real, adopted rules for utility-scale solar and battery storage -- but those rules have been rewritten multiple times in under two years, and a live moratorium on some large energy uses was still on the books as of this review. Anyone considering leasing land here for solar, storage, or a related energy use needs the current, not the historical, version of the county's rulebook.
This page covers what's specific to Saline County. For the general explanation, see the national guide.
The named solar ordinance: Resolution 24-2408
Saline County's current utility-scale solar rules trace to a specific, named ordinance: Resolution 24-2408, Solar Energy Conversion Systems, adopted by the County Commission on August 6, 2024, and added to the zoning code as a new subsection 12.16. The resolution followed a genuinely public process rather than a quick administrative fix -- the Planning Commission held a series of hearings beginning in February 2024, took extensive public input, revised the draft multiple times, and did not forward its recommendation to the County Commission until June 25, 2024. The county's hub page describes the resulting practical change as raising the required setback for ground-mounted, utility-scale solar from 100 feet to 600 feet from property lines, with additional screening potentially required near agricultural or residential land -- that 600-foot figure is the number to check a specific proposed layout against, not the ordinance's original 100-foot baseline.
For a landowner evaluating a solar lease offer, the practical implication of a 600-foot setback is that it meaningfully shrinks the usable interior of a parcel relative to the pre-2024 100-foot standard, particularly on irregularly shaped or narrower tracts -- a developer's proposed layout and acreage figures should be checked against the current setback, not against older marketing material or a neighboring county's more permissive rule.
Battery storage and a live moratorium -- a rulebook still being rewritten
Battery energy storage systems (BESS) have followed a rockier, more contested path than solar did. After the Planning Commission unanimously approved a specific BESS conditional use permit (CUP 25-09, a roughly 40-acre site at McReynolds and Simpson Roads) in late 2025, the County Commission voted 4-1 on January 6, 2026 to overturn that approval following a landowner protest petition -- detail already covered on the county hub. Separately, and worth verifying directly rather than assuming a fixed date, is when the county's standalone BESS-specific regulations (covering emergency notification, decommissioning plans, and fire-district coordination) were actually finalized: this review found independent reporting placing the Commission's 3-2 vote adopting those regulations in August 2025, which does not line up cleanly with a characterization of that vote as happening 'later in 2026.' Rather than pick one date without being able to confirm it directly, this page flags the discrepancy -- confirm the actual adoption date and the final, current BESS standard (including the specific setback the Planning Commission ultimately recommended, after reportedly rejecting a proposed half-mile setback in favor of a shorter one) directly with the county before relying on either.
On top of the BESS-specific rules, the County Commission voted 4-0 on March 17, 2026 to adopt a three-year moratorium, running through March 1, 2029, on new applications for data center, nuclear power, and hydrogen-energy facilities in unincorporated Saline County -- a moratorium that, as of this review, does not appear to extend to standard solar or battery-storage applications, which are instead governed by the specific ordinances described above. If a lease or purchase offer involves any large-scale energy use beyond conventional solar or battery storage, confirm directly with the county whether that specific use category still falls inside the active moratorium window.
Before signing anything, verify with the county directly
- Whether the county's solar setback is still 600 feet from property lines, and whether any additional agricultural or residential screening requirement under Resolution 24-2408 applies to the specific parcel.
- The current, final, adopted BESS-specific regulations -- including the actual setback standard the county settled on -- and their actual adoption date, since this review could not resolve a conflict between the county hub's stated 2026 timing and independent reporting pointing to 2025.
- Whether the March 2026 data center/nuclear/hydrogen moratorium is still in effect, still runs through its original March 2029 end date, and whether the specific use proposed for the parcel falls inside or outside that moratorium's defined scope.
- Whether a specific lease payment structure is contingent on the project clearing all of these county-level approvals, not just on signing the lease itself -- a project that stalls at the Commission level, as CUP 25-09 did, may never reach the payment stage a lease document describes.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Resolution 24-2408 Solar Energy Conversion Systems — Saline County, Kansas Government (accessed 2026-09)
- County Commission Approves New Solar Energy System Provisions — Salina311 (accessed 2026-09)
- County Approves BESS Regulations Amid Public Safety Concerns, Passes 3-2 — Salina311 (accessed 2026-09)
- Saline County Commission rejects proposed battery storage facility after resident petition — KWCH 12 Wichita (accessed 2026-09)
- Saline County Passes Three-Year Moratorium on Data Centers and Energy Facilities — Salina311 (accessed 2026-09)
- Planning and Zoning Department — Saline County, Kansas Government (accessed 2026-09)
Last reviewed 2026-09