Wind Energy in Tuscola County, Michigan: Turbines, Leases, and What to Check

Michigan's Thumb region is genuine wind-energy country, and Tuscola County is one of its more developed counties -- with multiple separate utility-scale projects rather than a single buildout. That means real lease income for host landowners, and real considerations for anyone buying land nearby.

This page covers what's specific to Tuscola County. For the general explanation, see the national guide.

Several separate, well-documented projects -- not just one wind farm

Unlike some Michigan counties with a single dominant wind development, Tuscola County hosts several independently developed utility-scale projects. The Tuscola Bay Wind Energy Center, a 120 MW project in Fairgrove operated by NextEra Energy Resources, was commissioned in December 2012. Consumers Energy's Cross Winds Energy Parks I, II, and III together add more than 111 MW and have been operating since 2014. The Tuscola II Wind Park spans Gilford, Wisner, Akron, and Fairgrove Townships, and the Tuscola III Wind Farm adds another 131 MW. Together, that's a genuinely substantial and geographically spread footprint across the county's northern and eastern townships -- worth understanding whether you're evaluating land as a potential host site or simply buying nearby.

Lease income: real, but confirm the specific terms rather than a general figure

Nationally, wind-lease structures vary widely: option-period payments (before a turbine is actually built) commonly run in the low single digits to low tens of dollars per acre annually, while operating-phase payments for a hosted turbine can run from a flat per-acre or per-turbine rate to royalty-based structures tied to the turbine's output. This research pass did not find Tuscola County-specific lease-rate figures published, so treat any general wind-lease-rate figure as a national reference point, not a Tuscola County number -- actual payments depend on the specific developer, turbine model, and negotiated agreement.

If a parcel you're evaluating already has a signed wind lease or easement recorded against it, request and review the full document through the Tuscola County Register of Deeds before closing -- term length, transfer and assignment provisions on resale, decommissioning obligations at the end of the turbine's operating life, and the actual payment structure (flat per-acre, per-turbine, or royalty-based) all vary meaningfully by agreement and are not standardized across developers.

What to check before buying land here with wind energy in mind

  • If you're interested in hosting turbines on land you're considering, ask the relevant township directly (Fairgrove, Gilford, Wisner, Akron, or others near existing projects) about its specific wind-energy siting standards -- setbacks, noise limits, and eligibility -- since Tuscola County's townships administer their own zoning individually rather than through one unified county wind ordinance.
  • If a parcel is already under a wind lease, pull the recorded document at the Register of Deeds and review it directly rather than relying on a seller's summary of its terms.
  • If you're buying land near, but not on, an active wind project, ask specifically whether any additional turbines or transmission infrastructure are planned nearby -- Tuscola County's multiple separate projects (Tuscola Bay, Cross Winds I-III, Tuscola II, Tuscola III) suggest continued interest in the area from more than one developer.
  • Confirm decommissioning requirements for any existing turbine near a parcel -- who is responsible for removal at end-of-life, and whether a bond or similar financial assurance is in place, are questions worth asking the township or developer directly.

Bottom line

Tuscola County's wind-energy footprint is real, substantial, and spread across several separate projects rather than concentrated in one location. That makes it a genuinely relevant factor for land buyers here -- both as a potential income opportunity for a landowner willing to host turbines, and as a due-diligence item for anyone buying nearby.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Tuscola Bay wind farm — Wikipedia (accessed 2026-09)
  2. Power plant profile: Tuscola County Wind Farm, US — Power Technology (accessed 2026-09)
  3. Power plant profile: Tuscola III Wind Farm, US — Power Technology (accessed 2026-09)
  4. Tuscola II Wind Park -- Gilford, Wisner, Akron and Fairgrove Townships, Tuscola County, Michigan — Empowering Michigan (Consumers Energy) (accessed 2026-09)
  5. Michigan to fast-track Tuscola County wind-farm expansion project — Wind Power Engineering (accessed 2026-09)
  6. Wind Turbine Economic Impact: Landowner Payments — Michigan EGLE (accessed 2026-09)
  7. Tuscola County Register of Deeds — Tuscola County, MI (accessed 2026-09)

Last reviewed 2026-09