Easements in Pope County, Minnesota
A major new high-voltage transmission line now has a finalized route through western and northern Pope County, and it will need a permanent, 150-foot-wide easement on every parcel it crosses -- acquired one negotiated agreement at a time, years before visible construction begins. Here's what that means for a Pope County land purchase.
This page covers what's specific to Pope County. For the general explanation, see the national guide.
The Big Stone South to Alexandria line has a final route through the county
The Big Stone South to Alexandria (BSSA) project is a proposed 345 kilovolt electric transmission line, developed jointly by Otter Tail Power Company, the Western Minnesota Municipal Power Agency, and Missouri River Energy Services. The full line runs roughly 95 to 105 miles, with 90 to 100 of those miles in Minnesota and the remainder in South Dakota. The Minnesota Public Utilities Commission -- the same state body that controls siting for utility-scale wind projects elsewhere on this site -- issued an order establishing a final route for the project, and that route runs through portions of western and northern Pope County specifically, per the county's own published notice. This is a state-permitted project, not a county land-use decision, and Pope County's Land Use Controls Ordinance (LUCO) and shoreland rules, covered on the hub, do not govern whether or where the line gets built -- only the PUC's route-permit process does.
The easement: a permanent 150-foot right-of-way, negotiated parcel by parcel
Once the PUC's route permit is final, the project's applicants acquire the necessary land rights not by eminent domain as a first step, but by negotiating an easement agreement directly with each affected landowner -- an offer based on fair market value, per the project's own landowner-resources materials. The physical right-of-way required is a new 150-foot-wide corridor for construction and ongoing operation of the transmission line and its associated facilities. Once agreed, the easement is recorded against the specific parcel's title in Pope County, meaning it becomes a permanent, running encumbrance that any future buyer of that parcel inherits along with the land -- not a temporary construction disruption that goes away once the poles are up.
Construction on the BSSA project is currently expected to begin in 2028 and take two to four years to complete. That multi-year runway matters for a buyer: a Pope County parcel along the final route may already have a recorded easement agreement on it well before any visible construction activity, or a landowner may currently be mid-negotiation with the project's land agents. Either way, the presence or absence of a BSSA easement is not something a buyer can infer from the current physical condition of the land.
What this means for your purchase
For any parcel in western or northern Pope County, check three things before assuming the BSSA project is irrelevant to a purchase: whether the parcel falls along the PUC's finalized route (the project's own maps and Pope County's website are the places to start); whether an easement agreement has already been signed and recorded against that specific parcel's title, which the Pope County Recorder's office can confirm; and, if no agreement exists yet, whether the project's land agents have already made contact or an offer, since a seller mid-negotiation may have information not yet reflected in the public record. A recorded 150-foot transmission easement running across a parcel can meaningfully affect where a future building site, driveway, or agricultural operation can go, even though the payment for it is a one-time transaction rather than an ongoing cost.
- Confirm whether a specific parcel falls along the BSSA project's finalized PUC route using the project's own maps or by contacting Pope County directly.
- Check with the Pope County Recorder for any already-recorded BSSA easement agreement on a specific parcel’s title before closing.
- If no easement is yet recorded but the parcel sits along the route, ask the seller directly whether the project's land agents have made contact or an offer -- that negotiation history may not show up in title records yet.
- Remember that Pope County's LUCO zoning and shoreland rules, covered on the hub, do not control this project -- route and permitting decisions run through the Minnesota Public Utilities Commission, not county government.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Minnesota Public Utilities Commission Issues an Order Establishing a Final Route for the Big Stone South to Alexandria Electric Transmission Line Project Impacting Portions of Pope County — Pope County, Minnesota Government (accessed 2026-09)
- Big Stone South to Alexandria Transmission Line | Landowner Resources — Big Stone South to Alexandria (OTPC/WMMPA/MRES) (accessed 2026-09)
- Route Permit Application — Big Stone South to Alexandria (OTPC/WMMPA/MRES) (accessed 2026-09)
- Notice of Big Stone South to Alexandria 345 kV Transmission Project Route Permit Application Filing with the Minnesota Public Utilities Commission — Pope County Tribune (accessed 2026-09)
- Landowners check out proposed Big Stone South power line routes through western Minnesota — West Central Tribune (accessed 2026-09)
- Landowners can now see detailed maps of BSSA routes — Stevens County Times (accessed 2026-09)
Last reviewed 2026-09