Sunflower County, MS
Wind & Solar Leasing in Sunflower County, Mississippi
Ruleville, in Sunflower County, is home to one of Mississippi's largest utility-scale solar installations: the Sunflower Solar Station, roughly 1,000 acres of Delta land converted to solar generation for Entergy Mississippi. Here's the project's real numbers, how it differs from a dual-use wind lease, and what it means for land-leasing interest in the county.
This page covers what's specific to Sunflower County. For the general explanation, see the national guide.
A 1,000-acre, full-footprint solar conversion in Ruleville
The Sunflower Solar Station sits on approximately 1,000 acres in Sunflower County, connected to Entergy's transmission grid near Ruleville. Recurrent Energy, LLC -- a wholly owned subsidiary of Canadian Solar, Inc. -- developed and built the facility under a Build-Transfer Agreement signed with Entergy Mississippi in 2018, which the Mississippi Public Service Commission approved unanimously in April 2020; Entergy Mississippi has owned and operated the plant since it reached commercial operation in September 2022. At the time it came online, Entergy described it as the largest solar installation in the state, built around single-axis tracking technology and roughly 272,000 individual PV modules, generating enough electricity to power an estimated 16,000 homes.
Unlike a dual-use wind project -- Tunica County's Delta Wind, covered on that county's own wind-solar-leasing page, keeps row crops growing beneath its turbines -- a utility-scale solar installation like this one is a full-footprint land conversion: the roughly 1,000 leased acres are dedicated entirely to solar generation for the length of the lease, not farmed alongside it. That's a materially different land-use and income trade-off for a landowner considering a similar lease offer elsewhere in the county, and it's worth understanding clearly before comparing a solar lease proposal against continued row-crop income or a wind-lease alternative.
Tax revenue, and what it signals about future development interest
Entergy states the Ruleville station will provide $17 million in ad valorem taxes to Sunflower County over its 30-year operating life -- a substantial, multi-decade new revenue stream for a rural Delta county, and a concrete number worth citing when evaluating how local governments here are likely to view (and potentially court) similar utility-scale energy proposals going forward. Entergy has also indicated broader plans to bring several more utility-scale solar farms online across Mississippi in the 2026-2027 timeframe, though this pass found no confirmation that any of those specific future projects are sited in Sunflower County -- treat that only as regional context, not a county-specific pipeline claim.
For a land buyer in Sunflower County, the practical takeaway is that utility-scale solar and wind leasing is now an established, real land use in this part of the Delta, not a speculative rumor -- a fact worth knowing whether you're hoping to attract a similar lease offer on your own acreage, or evaluating a parcel near an existing project and want to understand what your neighbors' land is already being used for. If you're approached with a lease proposal, get the actual agreement -- payment structure and escalators, easement scope, decommissioning-bond requirements, and lease term and renewal options -- reviewed by an attorney experienced in Mississippi solar/wind leasing before signing; this page's project details come from public reporting on the Sunflower Solar Station specifically and should not be assumed to describe the terms of any other developer's offer.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Mississippi Public Service Commission Gives Green Light to 1,000-Acre Solar Farm — Entergy (accessed 2026-09)
- Sunflower Solar Plant ensures a 'bright future' for Entergy and Mississippi — Entergy (accessed 2026-09)
- Sunflower County solar farm — Global Energy Monitor (accessed 2026-09)
- Power plant profile: Sunflower County Solar PV Project, US — Power Technology (accessed 2026-09)
- Construction of Mississippi's largest solar project complete — Solar Builder (accessed 2026-09)
Last reviewed 2026-09