Cooper County has gone from zero utility-scale solar to two active projects in a short span -- a smaller approved farm near the I-70 rest area and a much larger proposed development near Pilot Grove with 30-year leases already signed. Because the county has no zoning process, most of what happens next runs directly between developers, landowners, and the County Commission.

This page covers what's specific to Cooper County. For the general explanation, see the national guide.

The county's first solar farm: a smaller project near the I-70 rest area

Cooper County Commissioners approved the county's first utility-scale solar energy farm on land behind the Interstate 70 rest area -- a roughly 28-megawatt project sited on about 195 acres, with construction reported to have begun in early 2027. As the first project of its kind to go through county approval here, it set the template for how a solar development gets sited in a county with no zoning: rather than a rezoning or conditional-use hearing, the approval process ran through direct agreement with the County Commission, reportedly memorialized through a memorandum of understanding covering the roughly $2.4 million project.

That smaller project drew comparatively little public controversy relative to what followed -- a sign that scale and location matter a great deal to how a Cooper County community responds to a given solar proposal, and a useful contrast against the much larger Pilot Grove project described below.

The Pilot Grove project: a much larger proposal and real resident pushback

A second, far larger project has been proposed near Pilot Grove in southern Cooper County: reporting describes a roughly 240-megawatt solar farm across approximately 1,400 acres -- a scale local coverage described as dramatically larger than the earlier I-70 project. The owners of Crestmead Farm and neighboring Mayfield Farms have reportedly signed 30-year lease contracts with a developer, Renewable Energy Sources, with construction reportedly slated to begin in 2028 and finish in 2029. Renew Missouri and Renewable Energy Sources representatives attended an April 2026 town hall in Pilot Grove, where more than 100 local residents turned out to raise concerns about environmental impacts, property values, tax revenue, and the long-term visual and land-use effects of converting that much farmland to a solar array.

One detail worth flagging for anyone evaluating land near this project: reporting indicated the power generated would feed into transmission lines without any guarantee that the electricity itself would stay local -- a common feature of utility-scale solar leasing nationally, but one that shapes how residents weigh the tradeoff between hosting large-scale infrastructure and actually benefiting from the power it produces. Because Cooper County has no zoning process, there was no formal rezoning hearing tied to the resident concerns raised at the town hall; the project's path forward runs through the lease agreements already signed and whatever additional County Commission engagement follows, rather than through a public zoning board vote.

What a landowner considering a lease -- or living near one -- should check

  1. If you're approached about a solar lease, have an attorney experienced in Missouri solar-lease agreements review the term length (30 years is standard for the Pilot Grove deals reported here), decommissioning obligations, and payment escalation clauses before signing -- a lease this long will likely outlast your own ownership horizon.
  2. If you're buying land near either project (behind the I-70 rest area or near Pilot Grove), ask the seller and neighbors directly about the project's current construction timeline and status, since these multi-year build-outs (2027 for the smaller project, 2028-2029 for Pilot Grove) can shift.
  3. Because there's no zoning hearing process here, there's also no formal notice-and-comment mechanism guaranteed to alert an adjoining landowner to a new project proposal -- staying in touch with the County Commission's public meeting schedule is the practical way to track new solar or wind proposals before they're finalized.
  4. Ask about interconnection and transmission plans specifically if the amount of local benefit (versus power simply passing through to the regional grid) matters to your decision to support or oppose a nearby project.
  5. Confirm whether a specific parcel sits within either project's footprint or immediately adjacent to it using county records or the developer directly, since informal descriptions like "near Pilot Grove" or "behind the rest area" don't map precisely to a specific tract boundary.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. County Commissioners approve first solar energy farm in Cooper County — KRCG (accessed 2026-09)
  2. Some Cooper County farmers have concerns over new solar farm near Pilot Grove — KRCG (accessed 2026-09)
  3. Pilot Grove residents express concerns over solar farms — KOMU (accessed 2026-09)
  4. Cooper County residents hold town hall to discuss proposed solar field — ABC 17 News (accessed 2026-09)
  5. You might just spot a new solar farm if you're driving along I-70 in Mid-Missouri — KWOS (accessed 2026-09)
  6. Missouri Solar Lease Agreements: What Landowners Need — Ott Law Firm (accessed 2026-09)
  7. Solar Farms in Missouri -- Development Pipeline & Interactive Map — CleanView (accessed 2026-09)

Last reviewed 2026-09