Franklin County, seat Union, is one of the St. Louis metro's growing exurban counties along I-44 -- and, unlike most of the Missouri counties in this project, it has real, actively enforced county-wide zoning. A 2026 fight over how to zone data centers shows exactly how much that zoning framework matters for anyone buying land here.
Real zoning changes the playbook here
Franklin County is a genuine exception among the Missouri counties in this project: it has adopted county-wide planning and zoning under RSMo Chapter 64, administered by a dedicated Planning and Zoning Department at the county's Government Center (400 E. Locust Street, Union, Missouri). The department regulates land divisions, lot-line adjustments, zoning districts, address assignments, road naming, and floodplain administration in unincorporated areas, and the appointed Planning and Zoning Commission reviews rezoning requests, Planned Unit Developments, and preliminary plats at meetings typically held the third Tuesday of the month. A separate Board of Zoning Adjustment handles variance requests. Recent commission actions on the public record include a rezoning and PUD final development plan for a 198-lot subdivision near Highway 100 and Hogan Road in Boles Township, and a rezoning from the 'Y' to the 'R' zoning district for a 13.44-acre tract in Union Township -- concrete evidence that zoning district assignment and the rezoning process here are real, active, and outcome-determinative, not a formality.
That means the first thing to check on any Franklin County parcel is its current zoning district and what that district permits, conditionally permits, or prohibits -- something you generally do not need to worry about in most other Missouri counties covered in this project, where no zoning exists at all. The full Unified Land Use Regulations code is available from the Planning & Zoning Department (a paper copy runs $35), and the department's staff can confirm a specific parcel's district and any pending rezoning nearby that could affect it. See our dedicated zoning page for this county for the deeper detail on the data-center controversy and the subdivision/PUD process specifically.
The 2026 data center fight: what it signals for land buyers
Franklin County spent much of 2026 in a genuinely contentious public fight over how to zone data centers -- large, high-power-demand computing facilities that have been drawn to the county partly by its proximity to St. Louis-area electrical infrastructure and available land along the I-44 corridor. Coverage from Spectrum News, St. Louis Magazine, the Missourian, the Sierra Club, and local radio converges on a rough timeline: proposed zoning amendments were tabled in January 2026 pending further review, a six-month pause was adopted (since a shorter, more restrictive moratorium reportedly could not be enacted without triggering a fresh public-hearing requirement), the Planning and Zoning Commission took up revised proposals at a March 2026 meeting held at Union High School to accommodate public turnout, and after a lengthy public hearing the County Commission ultimately moved to a longer moratorium (reported as three years) on new data center applications while the county does further policy work. Proposed provisions along the way included setbacks as close as 150 feet from residential property lines and removing public-hearing requirements for future data center approvals -- both drew significant community pushback.
For a land buyer, the practical takeaway is not about data centers specifically -- it's about what this episode reveals: Franklin County's zoning apparatus is genuinely capable of both allowing and blocking a major land-use change, and the rules governing a specific type of use can shift meaningfully within a single year. If you're evaluating a parcel anywhere near existing high-voltage transmission infrastructure or a large flat tract that could be attractive to a similar large-scale user down the line, confirm the current moratorium status and zoning-district permissions directly with the Planning and Zoning Department rather than relying on a general sense that "the county has zoning" without checking the specifics for that use and location.
Septic, wells, floodplain, and the county's growth geography
Onsite wastewater treatment (septic) permits for unincorporated Franklin County are handled by the Franklin County Health Department (414 E. Main St., Union, MO 63084; 636-583-7300), whose environmental health program covers onsite sewage disposal alongside food and other environmental health inspections -- the standard Missouri arrangement of a local health department administering the state's Chapter 701 RSMo onsite wastewater program. Private wells fall under Missouri DNR's statewide well-construction rules rather than a separate county permit. Floodplain development permits and administration are handled through the Planning and Zoning Department's floodplain function, which matters here: Franklin County borders the Missouri River (Washington, New Haven) and includes the Bourbeuse and Meramec Rivers, both of which have produced significant flash-flooding and river-flooding events historically, including flooding along the Bourbeuse at Union.
Growth in Franklin County concentrates around Washington and Union and along the I-44 corridor, while the county's western and southern areas remain more rural, with real recreation-economy activity centered on the Meramec River (float trips, canoe/kayak outfitters, and riverfront campgrounds near Meramec State Park) and, in the county's northern reaches near New Haven, the edge of the Hermann American Viticultural Area's wine-trail tourism. Building permits are required for construction in unincorporated Franklin County through the county Building Department (636-583-6384), covering single- and multi-family homes, detached outbuildings, manufactured homes, and other structures -- a meaningfully more regulated baseline than a non-zoned county, and one more reason to confirm a specific parcel's zoning district and required approvals before buying rather than assuming rural land here is unregulated.
Who to Call Before Buying Land in Franklin County
Franklin County has a real Planning and Zoning Department, unlike most counties in this project -- always confirm a specific parcel's zoning district and any pending rezoning or moratorium status directly with that department before assuming a use is permitted. We could not confirm direct emails for most departments from public sources; use the phone numbers and websites above.
Planning & Zoning
Franklin County Planning and Zoning Department
Zoning district lookups, rezoning requests, PUDs, preliminary plats, conditional use permits, and the current status of the county's data-center zoning moratorium.
Building & Permitting
Franklin County Building Department
Building permits for construction in unincorporated Franklin County, including single/multi-family homes, outbuildings, and manufactured homes.
Environmental Health
Franklin County Health Department
Onsite wastewater treatment (septic) permits and general environmental health questions.
Septic / Onsite Wastewater
Franklin County Health Department (Environmental Health)
OWTS/septic construction permits and required soil evaluations.
Wells / Private Water
Missouri Department of Natural Resources -- Water Protection Program
Private well construction rules and certified well-contractor requirements statewide, including Franklin County.
Floodplain / Stormwater
Franklin County Floodplain Administrator (Planning and Zoning Department)
FEMA flood-zone questions and floodplain development permits for unincorporated Franklin County, including Missouri, Bourbeuse, and Meramec River flood exposure.
Assessor / Property Tax
Franklin County Assessor
Assessed value and property tax questions for a specific parcel.
GIS / Parcel Records
Franklin County GIS
Parcel maps, zoning-district overlays, and boundary lookups for a specific property.
Recorder / Clerk / Land Records
Franklin County Recorder of Deeds
Recorded deed, easement, and plat history for a specific parcel.
Agricultural Extension
MU Extension in Franklin County
Agricultural and land-management guidance for county landowners.
Want to know if this specific parcel actually works?
Tell us what you're looking at and we'll connect you with a local land specialist who can help you sanity-check it before you go further.
Get local guidanceTopics Specific to Franklin County
Sources
- Planning and Zoning Department — Franklin County, Missouri Government (accessed 2026-09)
- Planning and Zoning Commission — Franklin County, Missouri Government (accessed 2026-09)
- Unified Land Use Regulations — Franklin County, Missouri Government (accessed 2026-09)
- Board of Zoning Adjustment — Franklin County, Missouri Government (accessed 2026-09)
- Two large subdivisions planned in Union — The Missourian (emissourian.com) (accessed 2026-09)
- Franklin County P/Z recommends one or two data centers — Spectrum News (accessed 2026-09)
- Franklin County Commission data centers public hearing last 13 hours — Spectrum News (accessed 2026-09)
- Franklin County hits pause on data centers after tense meeting — St. Louis Magazine (accessed 2026-09)
- Franklin County revises proposed data center regulations — Missourian.com (accessed 2026-09)
- Franklin County Lifted its Own Six-Month Pause on Data Centers — Sierra Club (accessed 2026-09)
- Franklin County places moratorium on data centers — KOFO Radio (accessed 2026-09)
- Franklin County sees modest population gain — Missourian.com (accessed 2026-09)
- U.S. Census Bureau QuickFacts: Franklin County, Missouri — U.S. Census Bureau (accessed 2026-09)
- Franklin County, Missouri — Wikipedia (accessed 2026-09)
- Franklin County Department of Health — Missouri Department of Health and Senior Services (accessed 2026-09)
- Septic Information — Franklin County Health Department (accessed 2026-09)
- Franklin County — Missouri State Emergency Management Agency (accessed 2026-09)
- Hermann AVA — Wikipedia (accessed 2026-09)
- MU Extension in Franklin County — University of Missouri Extension (accessed 2026-09)
Last reviewed 2026-09