Wind and Solar Leasing in Nodaway County, Missouri

Nodaway County is one of Missouri's more established wind-energy counties, with two large operating wind farms already generating tens of millions in local tax revenue and landowner lease payments -- and a large proposed solar project following the same path, all without a county zoning process to route the negotiation through.

This page covers what's specific to Nodaway County. For the general explanation, see the national guide.

Two operating wind farms, not a proposal

The Tenaska Clear Creek Energy Center sits north of Maryville and comprises 111 Vestas turbines spread across roughly 31,000 acres, generating 242 MW. It reached commercial operation on May 4, 2020, and was projected to bring more than $1.2 million in annual tax revenue to local units of government. The White Cloud wind project, developed by Enel Green Power in southwest Nodaway County, is a 236.5 MW facility that began commercial operation in December 2020; over its operating life it is estimated to generate more than $43 million in property tax revenue and more than $56 million in lease payments to the landowners hosting its turbines.

Together these two projects mean a meaningful share of Nodaway County land already sits under an active wind lease or easement, and the county has a track record most other Missouri counties don't: a decade-plus of experience with turbine construction, road-use agreements, and the tax and payment structures that come with hosting utility-scale wind. If you're evaluating a parcel here, checking whether it -- or an adjoining parcel -- already carries a wind lease, easement, or setback agreement is a genuinely practical due-diligence step, not a hypothetical one.

Solar development is following the same path

ACCIONA Energy, a subsidiary of the Madrid-based renewable developer, has been developing a large solar project north-northwest of Barnard in southern Nodaway County. ACCIONA acquired the development from Tenaska in 2019 as part of a larger portfolio purchase of roughly 20 solar projects across the central US. Reported land assembly for the project has ranged from roughly 1,200 to 1,800 acres trending toward an estimate near 3,000 acres, with an estimated capacity around 300 MW. The most recent public reporting located during this research pass on the project's construction timeline dated to 2022, so its current status -- whether it has broken ground, been scaled back, or proceeded on the reported timeline -- should be verified directly with the Nodaway County Commission or ACCIONA before relying on any specific figure.

No zoning process means the lease and the County Commission are what govern this

Nodaway County has not adopted countywide zoning, so there is no rezoning fight, conditional-use permit, or zoning-board hearing standing between a landowner and a wind or solar lease. The regulatory touchpoints that do exist are narrower: the lease contract itself (negotiated privately between developer and landowner), any road-use or right-of-way agreement the developer negotiates directly with the County Commission for construction access and transmission-line routing, and -- if the parcel happens to sit within Polk Township near Maryville, where a separate township-level zoning ordinance may apply -- whatever process that ordinance sets up. For most of the county, though, a neighboring landowner has no zoning hearing to attend if a nearby parcel is leased for turbines or panels.

That absence of a public hearing process puts more weight on the lease document itself. Before signing anything, a landowner should have an attorney experienced in wind or solar leases review the term length, payment structure (per-acre, per-turbine, or production-based royalty), decommissioning and land-restoration obligations at the end of the lease, and how the agreement handles future changes in ownership of either the land or the project. Given that two projects have already operated here for several years, local landowners and the County Commission may have direct, practical experience with how those provisions have played out -- worth asking about before treating a new offer as a template-only decision.

What a buyer near an existing project should check

If you're purchasing land near the Clear Creek or White Cloud wind farms, or in the Barnard-area solar footprint, pull a title search through the Nodaway County Recorder of Deeds to confirm whether the parcel itself -- or an adjoining one with a shared boundary -- carries a recorded easement, setback agreement, or transmission right-of-way. Ask the seller directly whether any part of the property is affected by turbine setback requirements or has been approached for a lease, even if it was ultimately declined. And if uninterrupted views, noise levels, or shadow flicker near turbines matter to your intended use, visiting the specific parcel at different times of day, given the lack of a zoning-based buffer requirement, is worth the trip before you buy.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Clear Creek Energy Center — Wikipedia (accessed 2026-09)
  2. Wind Farm in Missouri Begins Commercial Operation — Mortenson (accessed 2026-09)
  3. Wind Farm in Northwest Missouri Begins Commercial Operation — PR Newswire (accessed 2026-09)
  4. White Cloud wind farm now operational — Maryville Forum (accessed 2026-09)
  5. White Cloud Wind Farm, USA — Enel Green Power (accessed 2026-09)
  6. Solar farm planned for southern Nodaway County — Maryville Forum (accessed 2026-09)
  7. Nodaway County, Missouri — Wikipedia (accessed 2026-09)

Last reviewed 2026-09