Wind & Solar Leasing in Cascade County, Montana

Cascade County already hosts one of Montana's first utility-grade wind farms, and its zoning code treats renewable energy as a real, specifically-regulated land use rather than an afterthought. A landowner considering a wind or solar lease here needs two things straight: which permit tier a project falls into, and whether the parcel sits close enough to Malmstrom Air Force Base for the county's height-and-buffer rule to constrain turbine siting.

This page covers what's specific to Cascade County. For the general explanation, see the national guide.

Two tiers: small systems by right, commercial wind farms need a special use permit

Cascade County's Zoning Regulations address renewable energy in the unincorporated county through separate code sections depending on scale. Under §8.10, wind and solar generation facilities under 1 megawatt are permitted by right in the Agricultural district, subject to development standards spelled out in §8.12 -- meaning a landowner installing a smaller wind turbine or a solar array sized to serve a farm, ranch, or residential operation generally doesn't need a special use permit, just a standard Location/Conformance Permit from the Planning Department. Larger commercial wind farms -- anything over 1 megawatt -- fall under a separate section (§8.11) and are not a by-right use; a project at that scale requires a special use permit through the county's Zoning Board of Adjustment, using the same Special Use Permit Application process the county uses for other conditional uses. If you're being approached for a wind or solar lease, the proposed system's rated capacity is the first thing that determines which process (and timeline) you're actually looking at -- ask the developer directly which tier their project falls into, and confirm it with Planning & GIS rather than taking the developer's characterization at face value.

Horseshoe Bend Wind Park: a real, operating project -- and an active expansion

Cascade County isn't a hypothetical wind-energy market: the Horseshoe Bend Wind Park, built for United Materials of Great Falls and sited off McIver Road near Great Falls, has been operating since 2006 as one of the state's earliest utility-grade wind projects -- six GE 1.5-megawatt turbines totaling 9 MW. More significant for a landowner evaluating a lease today is that a Phase 2 expansion, planned at roughly 140 MW, has been in active development for the same site area -- a scale increase of more than fifteen times the original project. That means Cascade County has a real, precedented developer relationship and permitting history to point to, not just zoning language on paper; ask any leasing prospect directly whether their project is affiliated with, or sited near, the existing Horseshoe Bend project and what stage of interconnection and permitting it has reached, since a large-scale project's timeline (interconnection queue position, transmission capacity, environmental review) typically runs years longer than a small by-right system's.

Malmstrom's height buffer is a real constraint on tall turbines, not just an abstract overlay

The county's zoning code ties structure-height limits near Malmstrom Air Force Base to the elevation of the base's helicopter runway (3,526 feet, NAVD 88 datum): no structure is allowed at all within roughly 1,200 feet of a Military Airfield Facility or Landing Field, and any structure taller than 50 feet within roughly 1,200 to 2,400 feet requires a Zoning Board of Adjustment variance, with the application sent to Malmstrom for review and comment. A commercial wind turbine -- typically well over 300 feet to blade tip -- is exactly the kind of structure this rule is built to catch, and Malmstrom's roughly 200 dispersed Minuteman III launch facilities across the county mean the relevant buffer isn't limited to the base's main boundary near Great Falls; it applies around each individual missile site scattered through the rural county as well. Before signing a wind or solar lease on rural Cascade County land, confirm the parcel's distance to the nearest Malmstrom facility (base boundary or missile launch site) with Planning & GIS, and don't assume a site is clear of the buffer simply because it's far from Great Falls itself.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Cascade County Zoning Regulations (PDF, revised Dec. 2021) — Cascade County, Montana Government (accessed 2026-09)
  2. Cascade County, MT, Zoning Regulations (summary) — American Planning Association (accessed 2026-09)
  3. Special Use Permit Application Package — Cascade County, Montana Government (accessed 2026-09)
  4. Wind Projects :: Horseshoe Bend Wind Park — MontanaGreenPower.com (accessed 2026-09)
  5. Horseshoe Bend Wind Park — Renewable Northwest (accessed 2026-09)
  6. Horseshoe Bend - Phase 2 — Renewable Northwest (accessed 2026-09)
  7. Horseshoe Bend Wind Park - Wind Applications Center — Montana State University (accessed 2026-09)
  8. Cascade County Zoning Regulations Revised December 28, 2021 (Agenda Center copy) — Cascade County, Montana Government (accessed 2026-09)

Last reviewed 2026-09