Seneca County, NY
Wind and Solar Land Leasing in Seneca County, New York
Seneca County's flat, open farmland north of the lakes has drawn two major utility-scale solar projects -- Trelina Solar Energy Center and the North Seneca Solar Project, both in the Towns of Waterloo and Junius -- sited not through local town planning boards but through New York's state-level Office of Renewable Energy Siting (ORES). Here's what that process means for a lease, and for land nearby.
This page covers what's specific to Seneca County. For the general explanation, see the national guide.
Two real, named, state-approved solar projects -- not speculative interest
Renewable-energy development in Seneca County is concrete and already well along, not a future possibility. Trelina Solar Energy Center, an 80-megawatt facility developed by a NextEra Energy Resources subsidiary in the Town of Waterloo, was approved by the state's Board on Electric Generation Siting and the Environment in late 2021, built on land bought and leased from Gem Lake Farms, and sits within the Waterloo Central School District. Separately, the North Seneca Solar Project -- a 90-megawatt facility spanning roughly 827 acres across the Towns of Waterloo and Junius, with about 418 acres (44% of the site) actually converted to built or maintained facility area -- received its final Major Renewable Energy Facility siting permit from the state's Office of Renewable Energy Siting (ORES) on August 21, 2025, after Solar Land Lease Agreements were executed with five landowners of record, each running 32 years from the start of operations with options to extend.
If a parcel is being marketed with reference to either project or to renewable-energy potential generally, ask specifically whether it's under an already-executed lease with one of these developers, an option agreement, or simply sits within a broader area of developer interest -- those are very different positions, and proximity to Trelina or North Seneca doesn't mean a specific neighboring parcel has, or will get, its own lease offer.
ORES siting bypasses the town planning board -- a real process difference
Both projects were sited under New York's Section 94-c framework, administered by the state Office of Renewable Energy Siting, which handles permitting for any renewable facility of 25 megawatts or more (or 20 MW-plus if the developer opts in) through a single consolidated state review rather than the town's usual zoning and site-plan process. Critically, while ORES is required to apply local standards -- including a town's own zoning -- to a proposed project, it can and does decline to enforce specific local provisions it finds 'unreasonably burdensome' in light of the state's climate-law targets, a precedent the agency set in a 2021 ruling on a different upstate wind project. Practically, this means a solar project sited under ORES may proceed even where the specific host town's zoning board or planning board would otherwise have withheld approval or imposed different conditions -- a materially different process than the standard 239-m referral review described elsewhere on this county's hub for smaller local projects.
For a landowner near either project, this means the county's or town's own planning department is not the final word on whether a large-scale solar facility can be sited nearby -- ORES's own siting permit, publicly filed at documents.dps.ny.gov, is the controlling document, and it's worth reviewing that permit's specific conditions (site layout, setbacks from adjoining parcels, screening, and decommissioning requirements) directly rather than assuming standard town zoning setbacks apply.
What a lease and its associated payments actually look like
For Trelina specifically, public reporting describes the developer committing to $60,000 in direct annual payments to the Town of Waterloo plus separate property-tax revenue governed by a Payment-in-Lieu-of-Taxes (PILOT) agreement negotiated through the Seneca County Industrial Development Agency, with the developer projecting roughly $10.7 million in total additional local benefits (town, county, and school district combined) over the project's life -- figures reflecting developer and news reporting rather than a verified final PILOT schedule, which can be renegotiated over a project's life. Statewide, Cornell Cooperative Extension materials on solar land leasing describe typical per-acre lease income in the range of roughly $250 to $2,500 per acre per year, with some landowners reporting offers between $1,100 and $2,000 per acre -- useful context for evaluating an offer, though actual Seneca County lease rates for either named project were not independently confirmed in this research pass and are typically kept confidential by the parties themselves.
- Whether an offer is an option payment (smaller, paid while the developer decides whether to build) or an operating lease payment (larger, paid once the facility is generating) -- these are commonly confused and materially different in amount.
- The lease term and any extension options -- North Seneca's own agreements run 32 years from the start of operations, a multi-decade commitment worth planning around for estate and resale purposes.
- Who bears decommissioning costs and site restoration obligations at the end of the lease term; ORES permits generally require a decommissioning plan and financial security, but confirm this is addressed in a specific lease rather than assumed.
- Whether the parcel being offered is inside the ORES-approved project boundary at all, versus simply near it -- a nearby but non-participating landowner receives no lease payment but may still see the facility's visual, access-road, or construction-traffic effects.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Siting Board Approves 80-Megawatt Seneca County Solar Farm — New York State Department of Public Service (accessed 2026-09)
- Trelina Solar Energy Center -- Project Benefits — Trelina Solar Energy Center (accessed 2026-09)
- North Seneca Solar Project ORES Permit Application (Exhibit 4: Real Property) — New York State Department of Public Service / ORES (accessed 2026-09)
- North Seneca Solar Project — North Seneca Solar Project, LLC (accessed 2026-09)
- New York State Office of Renewable Energy Siting Sets Precedent in Section 94-c Permit Proceedings — Foley Hoag LLP (accessed 2026-09)
- Farming: Solar and ag in Seneca County -- what you need to know — Finger Lakes Times (accessed 2026-09)
- Solar Land Leasing — Cornell Cooperative Extension of Seneca County (accessed 2026-09)
Last reviewed 2026-09