Wind and Solar Leasing in Dickey County, North Dakota

The Foxtail Wind Energy Center has a real, documented paper trail worth knowing before treating it as a generic 'wind farm nearby' fact: a specific Public Service Commission approval, an ownership change from its original developer to Xcel Energy, and disclosed landowner-lease and local-tax figures. Here's the record, and what it means for anyone near the project or evaluating a new lease elsewhere in the county.

This page covers what's specific to Dickey County. For the general explanation, see the national guide.

A documented PSC approval, and construction-to-operation timeline

Foxtail Wind Energy Center's siting wasn't an informal or undocumented process -- it went through the North Dakota Public Service Commission as a formal case, PU-17-284, and received approval in December 2019 as a project of Northern States Power Company (the Xcel Energy operating subsidiary that serves this part of North Dakota) sited on roughly 20,000 acres in western Dickey County, south of Merricourt. Construction on the 75 Vestas turbines began in summer 2018, with the turbines installed and brought online in 2019. That PSC docket number is the actual reference point for anyone who wants to review the siting conditions, turbine layout, or any conditions of approval attached to the project -- not a general project description.

The project was originally developed by a subsidiary of NextEra Energy Resources, the same national developer behind projects like Bowman Wind and Cavalier County's Langdon Wind Energy Center elsewhere in North Dakota, before Xcel Energy formally acquired the completed, 150-megawatt facility. For a landowner or buyer, that development-then-acquisition sequence is a common pattern in wind projects nationally, but it means the entity that actually owns and operates Foxtail today -- Xcel Energy, through Northern States Power -- is not necessarily the same company a landowner or neighbor may remember negotiating with during the original development and siting phase.

Disclosed landowner-lease and local-tax figures

Unlike many wind projects where lease economics stay private between developer and landowner, Foxtail Wind's public project materials disclosed specific aggregate figures: roughly $30 million in lease payments to local landowners over the project's 30-year expected life, and roughly $20 million in property tax revenue to local governments over the same period, intended to support local infrastructure and services. These are project-wide totals, not per-parcel figures -- an individual landowner's actual lease payment depends on the specific number of turbines, access roads, and easement acreage on their own land under their own contract -- but they give a landowner or buyer a real, sourced benchmark for the scale of the project's economic footprint in the county, rather than a vague sense that 'wind brings in some money.'

What to verify before treating a Foxtail-area lease or new offer as straightforward

  • Confirm the current owner and lease-administration contact for any turbine, easement, or access road on your specific parcel is Xcel Energy/Northern States Power, and get the current contact for lease servicing rather than assuming the original NextEra-affiliated developer still administers it.
  • Pull the actual PSC docket (PU-17-284) if you want to review specific siting conditions, turbine setback requirements, or any conditions of approval that might affect a neighboring parcel's own development potential.
  • If a listing near the project references "wind income" or "turbine lease," ask for the actual, current lease document rather than relying on the project-wide $30 million/30-year aggregate figure as a stand-in for what a specific parcel earns.
  • Ask directly about the property-tax treatment of any parcel with turbine infrastructure on it, since wind-generation equipment can be assessed differently than raw agricultural land -- confirm current assessed value with the Dickey County Tax Equalization Office rather than assuming standard agricultural tax treatment applies.
  • If you're evaluating land in a township, like Spring Valley, that has adopted its own turbine-setback ordinance, confirm whether that township-level rule -- not just the PSC's original siting approval for Foxtail -- would govern any future turbine or expansion near your specific parcel.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Xcel Energy acquires Foxtail Wind Energy Center in N.D. — Xcel Energy Newsroom (accessed 2026-09)
  2. Xcel Energy Acquires Foxtail Wind Energy Center — POWER Magazine (accessed 2026-09)
  3. Xcel officially acquires 150-MW NextEra wind project in N Dakota — Renewables Now (accessed 2026-09)
  4. Foxtail Wind: North Dakota Public Service Commission hears testimony on Dickey County project — Bismarck Tribune (accessed 2026-09)
  5. Foxtail Wind Farm — Jamestown Sun (accessed 2026-09)
  6. North Dakota Active Wind & Solar Projects (PSC list) — North Dakota Public Service Commission (accessed 2026-09)

Last reviewed 2026-09