Washington County, OR
Zoning in Washington County, Oregon: The 2023-2024 Semiconductor UGB Fight
Facing national competition for chip-manufacturing investment, Oregon gave its governor a time-limited power to designate semiconductor sites outside the normal urban growth boundary process. In Washington County, that power moved a 373-acre Hillsboro-adjacent site forward -- while a competing Cornelius-area site ran straight into a rural-reserve designation that had walled it off from development years earlier. Here's both stories and what they mean for land near either site.
This page covers what's specific to Washington County. For the general explanation, see the national guide.
Why Oregon created a special, time-limited UGB bypass in 2023
Oregon's ordinary process for expanding an urban growth boundary is deliberately slow: it typically requires a city or Metro to demonstrate land need decades out, coordinate with DLCD, and survive potential appeals to the Land Use Board of Appeals, a process that can take years. In 2023, facing genuine competitive pressure from other states actively courting large semiconductor manufacturing investment (in the wake of the federal CHIPS Act and a broader national push to reshore chip production), the Oregon Legislature passed Senate Bill 4, giving the governor a specific, time-limited power: the authority, through the end of 2024, to designate particular sites for large-scale semiconductor and industrial development outside the normal UGB expansion process entirely.
This was a genuinely unusual move in a state whose entire land-use identity is built around a deliberately slow, statewide-goal-driven UGB process -- and Washington County, as the physical home of Oregon's "Silicon Forest" semiconductor cluster around Hillsboro, was the obvious place this authority would be used first.
The Hillsboro-adjacent site: 373 acres moved forward under SB 4
Governor Kotek used the new SB 4 authority to move a 373-acre site adjacent to Hillsboro toward designation for semiconductor development -- a direct, concrete use of the bypass power the legislature had just created. For a land buyer, a parcel anywhere near this designated site should be evaluated with the understanding that its immediate surroundings were, as of 2023-2024, in the middle of an active, high-priority industrial-development push backed by a specific state statute, not an ordinary rezone application working through the county's normal process on its usual timeline.
The Cornelius site: blocked not by opposition, but by a rural-reserve designation
A separate, competing proposal favored by some local officials would have used a roughly 430-acre site near Cornelius for similar semiconductor development. That site ran into a specific, structural obstacle rather than simple political opposition: the land had already been designated a "rural reserve" under the Portland region's urban/rural reserves framework -- a designation, made years earlier through a separate multi-jurisdictional process, that explicitly sets aside land as off-limits to urbanization for a long planning horizon (typically decades), as a counterpart to "urban reserves" that are pre-identified as the region's preferred future growth areas.
That distinction matters for any land buyer trying to read Washington County's semiconductor-development story as a signal about nearby land values. A parcel's mere proximity to a place like Cornelius, or even genuine local political interest in developing it, does not mean it's actually eligible for urbanization -- a rural-reserve designation is a specific, durable legal status that a site either has or doesn't, and it takes far more than a single legislative session's UGB-bypass authority to change it. Confirm a specific parcel's urban-reserve, rural-reserve, or undesignated status directly with Metro before drawing any conclusions from general proximity to Hillsboro's semiconductor cluster.
What this means for evaluating land in the county
- Confirm a specific parcel's status directly with Metro's urban growth boundary and reserves lookup tools -- inside the UGB, an urban reserve, a rural reserve, or undesignated rural/resource land are four genuinely different statuses with very different development implications.
- For land near the Hillsboro-adjacent 373-acre site, confirm the current status of that SB 4 designation and any resulting development directly with Washington County and the City of Hillsboro, since the governor's bypass authority itself expired December 31, 2024.
- Do not assume a rural parcel near Cornelius, North Plains, or elsewhere in the county is a plausible future UGB-expansion candidate simply because it sits near Hillsboro's semiconductor cluster -- some of the most logistically convenient sites were specifically walled off as rural reserves years in advance.
- For a parcel with no connection to the semiconductor-siting story at all, this episode is still useful context: it shows that Washington County's rural/urban boundary, more than in almost any other Oregon county, is subject to genuine, high-stakes state-level policy attention -- confirm current zoning and reserve status directly rather than relying on an older map.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Gov. Kotek moves to expand urban growth boundary for new semiconductor center — KOIN (accessed 2026-09)
- Land use dispute snags Oregon semiconductor plan — Oregon Capital Insider (accessed 2026-09)
- Urban growth boundary address lookup — Metro (Portland regional government) (accessed 2026-09)
- Urban growth boundary — Metro (Portland regional government) (accessed 2026-09)
- 2024 Metro Urban Growth Boundary — Oregon Dept. of Land Conservation and Development (accessed 2026-09)
Last reviewed 2026-09