Overton County, TN
Wind & Solar Leasing in Overton County, Tennessee
Overton County's hub covers Dale Hollow Lake and the county's unzoned rural land generally. Near the Monroe substation off Byrdstown Highway, something more specific happened in 2025: a Silicon Ranch-owned solar farm and a co-located data center went up side by side, and the local electric co-op signed its first-ever power-purchase agreement with a non-TVA supplier. Here's what that project is, and what it means if you're evaluating a lease offer or nearby land.
This page covers what's specific to Overton County. For the general explanation, see the national guide.
What actually happened at the Monroe substation
Overton County's rural land near Livingston is, by the hub's own account, largely unzoned and governed mostly by the absence of local land-use restriction. That made it exactly the kind of place a utility-scale solar developer could move quickly: SR Monroe, LLC -- a project entity tied to Silicon Ranch, a Nashville-based solar developer with a large multi-state portfolio -- built a 4.75 MW solar array on roughly 109 acres adjoining UCEMC's Monroe substation, just off Byrdstown Highway. Reporting places the project's completion in 2025, and independent power-project databases (cleanview.co, Global Energy Monitor) list it as an operating facility rather than a proposal still in permitting.
What makes this more than a routine solar-farm story for Overton County specifically is UCEMC's own framing of the deal: the cooperative's communications describe the power-purchase agreement with SR Monroe as the first time UCEMC has bought electricity from a supplier other than TVA. For a rural electric cooperative that has historically resold TVA power exclusively, that's a genuinely notable, dated shift -- one driven, per UCEMC's own account, by solar power pricing that can now undercut TVA's wholesale rate in at least some circumstances.
The data center next door
Almost simultaneously, site preparation began across the road from the solar farm for a data center, reported as targeting summer 2025 operation. Reporting describes the facility's power arrangement with UCEMC as flexible or interruptible -- meaning its draw can reportedly be reduced or paused during peak demand periods, letting the co-op prioritize residential and essential-service load ahead of the data center's own consumption. That's a materially different arrangement than a typical always-on industrial user, and it's worth understanding on its own terms if you're evaluating land nearby: confirm directly with UCEMC and Overton County government what, if anything, was required for permitting, and whether any additional capacity (substation upgrades, new transmission) is planned for the corridor as a result.
Because Overton County has no general zoning or building-permit requirement outside Livingston's city limits (per the county's own Permits & Zoning page, covered on the county hub), a project like this can move through the unincorporated county with far less local land-use review than it would face in a zoned jurisdiction. That cuts both ways for a nearby landowner: it means a project like this can appear relatively quickly once a developer and the co-op agree to terms, but it also means there's less of a public zoning-hearing record to consult for details -- UCEMC and the developer's own public statements are the more useful starting point than a county planning file.
If you're evaluating a lease offer or land near a substation corridor
- Confirm with UCEMC directly whether additional substation or transmission capacity is planned for the Monroe corridor, since that capacity is often what makes a specific parcel attractive to a solar or data-center developer in the first place.
- If you've received a solar lease offer, get the actual agreement reviewed by an attorney experienced in energy leases -- check the per-acre or royalty payment structure, the lease term and any renewal options, decommissioning obligations at the end of the lease, and whether the lease or any easement for access roads/collection lines would transfer with a future sale of the land.
- Ask whether your parcel sits within Silicon Ranch's broader Tennessee footprint (the company has developed multiple utility-scale projects across the state) or is being approached independently -- a developer with an existing project nearby may already have relevant interconnection studies or substation capacity data relevant to your land.
- Because Overton County has no zoning outside Livingston, a large solar or data-center project near your parcel isn't necessarily subject to a public rezoning hearing the way it would be in a zoned county -- check directly with the Overton County Mayor's office and UCEMC for the most current information on any proposed nearby project rather than assuming a hearing process will surface it.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- New Developments Near Monroe Substation — Upper Cumberland Electric Membership Corporation (UCEMC) (accessed 2026-09)
- New Solar Farm and Data Center Underway Near Monroe Substation — The Livingston Enterprise (accessed 2026-09)
- SR Monroe, LLC — Overton, Tennessee — Cleanview (accessed 2026-09)
- SR Monroe, LLC solar project — Global Energy Monitor (accessed 2026-09)
- Permits & Zoning - Overton County, Tennessee — Overton County, Tennessee (accessed 2026-09)
Last reviewed 2026-09