If a solar or wind developer has approached you about leasing Sevier County land, you're not the first landowner in the county to get that call. Sigurd Solar -- an 80-megawatt project on 600 acres west of Sigurd -- has been up and running since 2021, and it moved through the county's ordinary permitting process rather than a special legislative deal. Here's what that precedent actually looked like, and what it means for evaluating a new lease offer.
This page covers what's specific to Sevier County. For the general explanation, see the national guide.
Sigurd Solar: a real, completed project, not a proposal
Sigurd Solar is an 80-megawatt photovoltaic project covering roughly 600 acres of land west of the town of Sigurd, in the same county as the Sufco coal mine covered elsewhere on this site. The project began construction in 2019, reached financial close under Community Energy Solar's development and was later acquired by D.E. Shaw Renewable Investments (DESRI), and entered commercial operation in 2021 -- making it Sevier County's first utility-scale solar project. Reporting on the project describes it as producing enough electricity for roughly 18,500 households, supporting around 300 construction jobs at its peak, and generating ongoing property tax revenue for the county over the project's operating life. This is a completed, operating asset, not a pending application -- useful context for gauging how seriously to weigh a new lease proposal that cites solar as a growth industry here.
The project's origin is also worth knowing if you're the one being approached: reporting indicates the concept began when an outside development company brought a proposal to Sevier County and assembled the planning and zoning package that was ultimately sold to the project's eventual owner. That's a common pattern in solar development -- the entity signing your lease and the entity that ultimately owns and operates the finished project are frequently different companies, so ask directly whether the counterparty on your lease intends to build and hold the project, or to develop it for resale.
How a solar or wind project actually gets approved here
Sevier County zones land under Title 14 of its county code (covered in more general terms on the county hub), and solar energy development has been processed through the county's Conditional Use Permit (CUP) track rather than through a standalone renewable-energy ordinance or a special state exemption. That means a solar or wind proposal on your land would go before the Sevier County Planning Commission as a conditional use application tied to the parcel's existing zoning district, not through some separate fast-track process -- the same public planning-commission review that applies to other conditional uses in the county.
A related, practical detail: Sevier County has considered rezoning specific parcels from Agricultural to Industrial to accommodate battery-storage components associated with renewable-energy projects. If a lease offer on your land includes a battery storage facility alongside solar or wind generation, understand that the storage component specifically may require its own rezone application, separate from whatever conditional-use approval covers the generation equipment itself -- don't assume one approval covers both parts of a combined project.
If you're the landowner being approached about a lease
- Ask the developer directly whether they intend to hold the completed project or sell it once permitted and financed -- Sigurd Solar's own history shows ownership can change between the proposal stage and commercial operation.
- Confirm with Sevier County Planning & Zoning whether your parcel's current zoning district allows solar or wind generation as a conditional use, and whether any battery-storage component would need a separate Agricultural-to-Industrial rezone.
- Ask what a Conditional Use Permit application and public hearing timeline typically looks like for a project of the proposed size, based on the county's handling of Sigurd Solar and any more recent applications.
- Have an attorney experienced in energy leases review payment structure, term length, and decommissioning obligations in the lease itself -- a county's CUP approval process does not substitute for equivalent protections in your own contract.
- Ask about property tax treatment for the leased acreage once a project is built, since Sigurd Solar's own case shows a completed project becomes an ongoing county tax revenue source, which can affect how the county and neighbors view a proposed project.
Ready to talk to someone who knows land?
Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.
Connect with a local land specialistSources
- Solar farm near Sigurd covers 600 acres — Sanpete Messenger (accessed 2026-09)
- Sigurd Solar LLC -- Sevier, Utah — CleanView (accessed 2026-09)
- Construction started for Sigurd solar power plant — Mid-Utah Radio (accessed 2026-09)
- DESRI reaches financial close for 80MW Sigurd solar project in US — NS Energy Business (accessed 2026-09)
- Sigurd Solar — Global Energy Monitor (accessed 2026-09)
- D. E. Shaw Renewable Investments Announces Financial Closing of the Sigurd Solar Project — PR Newswire (accessed 2026-09)
- FOX 13 News 360: Solar farms on the rise in rural Utah — FOX 13 (KSTU) (accessed 2026-09)
Last reviewed 2026-09