US Land Life

Preston County, WV

Wind and Solar Leasing on Land in Preston County, West Virginia

Preston County has real, decades-long proof that utility-scale wind works here: Mountaineer Wind Energy Center has operated on Backbone Mountain since December 2002. That history is a genuine asset for anyone evaluating their own land's wind-leasing potential -- and a reason to go in informed about how these leases actually work, rather than negotiating from a standing start.

This page covers what's specific to Preston County. For the general explanation, see the national guide.

Mountaineer Wind proved the concept here two decades ago

Mountaineer Wind Energy Center sits on a 4,400-acre site along Backbone Mountain, straddling the Preston/Tucker county line, and consists of 44 wind turbines with a combined capacity of 66 megawatts. It came online in December 2002 as the first wind farm built in West Virginia and, at the time, the largest wind farm east of the Mississippi River -- a genuinely significant regional project, not a small pilot installation. The project was initially developed by Atlantic Renewable Energy Corporation, later passed to FPL Energy, and is now owned and operated by a subsidiary of NextEra Energy Resources, one of the largest renewable-energy generators in the United States.

For a Preston County landowner, that history matters less as a curiosity and more as evidence: Backbone Mountain's ridge-top wind resource has been commercially proven at utility scale for more than two decades, through multiple ownership changes, which is a stronger signal of long-term viability than a developer's projection for an unproven site would be. It also means Preston County already has an established regulatory and community track record with utility-scale wind -- permitting precedent, an operating history for local officials and residents to reference, and known logistics (turbine delivery routes, construction-era road use, interconnection to the regional grid) that a newer wind-development county wouldn't have.

What a wind lease on your own land would actually involve

Wind development follows a fairly standard sequence nationally, and Preston County is no exception. A developer typically starts with a wind-resource assessment (often a met tower or remote sensing on the specific ridge or parcel) well before offering a lease, then proposes an option/lease agreement that pays a smaller option fee during evaluation and permitting, followed by either per-turbine royalties or a percentage of revenue once turbines are operating. Ridge-top and mountain-crest land -- the same kind of terrain that made Backbone Mountain attractive -- is generally what developers look for in Preston County's topography, since consistent, higher-elevation wind is what makes a site commercially viable in the first place; flatter valley land is much less likely to attract a wind-lease offer regardless of overall county-level wind activity.

Before signing anything, a landowner should get clarity on several points that matter more in practice than the headline royalty rate: the lease term and any automatic-renewal language, decommissioning obligations and whether the developer posts a bond or other financial assurance to actually remove turbines and restore the land at end of life, access-road and transmission-easement scope (these often extend beyond the turbine pad footprint itself and can affect areas of the property far from any turbine), and how the agreement treats future changes in turbine technology or repowering. A wind lease is a long-term, often multi-decade commitment on a portion of the land regardless of who owns the surface -- reviewing it with an attorney experienced in renewable-energy leases, not just a general real estate attorney, is worth the cost given how long these agreements typically run.

What to check before assuming your parcel has leasing potential

  • Elevation and ridge exposure relative to Backbone Mountain and other developed wind sites in the region -- a parcel's wind resource is fundamentally a function of its specific terrain, not just its county.
  • Whether an existing wind lease, easement, or interconnection agreement already runs across or near the parcel from a prior transaction -- confirm via a title search at the Preston County Clerk's office, not just a conversation with the seller.
  • Current interconnection capacity and queue status at the nearest substation or transmission line, confirmed directly with the relevant transmission operator rather than assumed from Mountaineer Wind's own existing interconnection.
  • Any local zoning, height, or setback restrictions that could apply if Preston County or a nearby municipality has since adopted rules specific to wind turbines -- confirm current status directly rather than assuming the absence of countywide zoning covers turbine siting the same way it covers ordinary construction.
  • Whether a solar lease, rather than wind, might better fit a specific parcel's terrain and sun exposure -- solar development follows a different siting logic (open, unshaded, moderate-slope land near existing distribution infrastructure) than the ridge-top wind siting that defines Backbone Mountain.

Ready to talk to someone who knows land?

Tell us what you're trying to do and we'll connect you with a local land specialist -- someone who understands zoning, perc, and access, not just listings.

Connect with a local land specialist

Sources

  1. Mountaineer Wind Energy Center — Wikipedia (accessed 2026-09)
  2. Mountaineer Wind Farm Dedicated — Renewable Energy World (accessed 2026-09)
  3. e-WV - Wind Power — West Virginia Encyclopedia (accessed 2026-09)
  4. Take a spin through the Mountain State's wind farms — WV Gazette-Mail (accessed 2026-09)
  5. Power plant profile: Mountaineer Wind Energy Center, US — Power Technology (accessed 2026-09)

Last reviewed 2026-09